13
INSTALLATION GUIDE FEELGOOD SHOWER UV/IR V4
8. BRACKET ALUMINIUM PROFILE
9. SEALING WALL AND FRAME
Requirements
1
2
3
4
5
1: Wall
2: Plasterboard
3: Tile
4: Kit
5: Applying kit round the frame
Rear view
frame
SEAL THE ALUMINUM FRAME ALL AROUND IN THE GROOVE
(INDICATED LOCATION 5) AND PLACE THE ALUMINIUM FRAME
IN THE HOLE .