To fold the Xebex Rower, simply pull the PULL PIN (J8) located between Forward Base (A) and Base Railing (B).
This will cause Forward Base (A) to drop down and will allow you to raise Base Railing (B) so that Forward Base
Leg (C) will be facing outward. When you are ready to unfold the Xebex Rower again, simply pull on PULL PIN (J8)
while holding onto Base Railing (B). This will cause Base Railing (B) to drop.
NOTE
: Please use a firm grip on ALL MOVING PARTS when folding the Xebex Rower. The weight of the rower
will cause Forward Base (A) to drop aggressively when folding and will cause Base Railing (B) to drop aggressively
when unfolding.
Содержание Air Rower AR-2
Страница 1: ...2...
Страница 11: ...C5 C3 A62 K J0...