6.3 Daily storage and protection
When storing the pipe jacking machine, note the following:
1) Before the pipe jacking machine is stored, the entire machine is cleaned. In particular,
the mud pumping system needs to be cleaned to keep the whole machine clean and tidy.
2) It is recommended to place the parts flat on the ground, correcting the cylinder, the main
fuel tank are in a fully contracted state (the whole state and the same transport status, see the
transport dimensions of the drawings);
3) After closing the equipment, inspect the valve block lever, key switch, power switch,
circuit breaker switch, etc.
4) The place where the pipe jacking machine is placed shall be capable of sheltering from
wind and rain, suitable temperature, and away from flammable, explosive and other dangerous
articles.
5) The machine must be covered with a canvas to prevent dust, dust, etc. from damaging
important parts of the machine.
6) Start the pipe jack once every one month or so, and test all the actions of the whole
machine 2-3 times.
7) If the downtime exceeds 2 months, check the cleanliness of the hydraulic oil tank
regularly. If it is not required, the tank must be cleaned and the oil body replaced. And in
accordance with Chapter 4 lubrication maintenance rules, the entire machine maintenance.
Remarks:
Motor storage precautions are detailed in the motor instruction manual.
84
Содержание XDN450
Страница 1: ... Xuzhou Construction Machinery Group Co Ltd XDN450 Pipe Jacking Operation Manual ...
Страница 23: ... 4 Electric control cabinet Unit mm 5 Main pump station Unit mm 2 ...
Страница 24: ... 3 ...
Страница 31: ... machine and construction PLC OMRON Rated voltage AC220V three phase 60Hz Working frequency 60Hz 10 ...
Страница 36: ... Chapter Three Operational Instruction 3 1 Device installation 3 1 1 System structure 15 ...
Страница 40: ... 4 Check if the voltage is 220V 5 The main switch in the electric control cabinet 19 ...
Страница 70: ... 49 ...
Страница 71: ... Enter the X coordinate area Enter the current area 50 ...
Страница 72: ... 51 ...
Страница 73: ... Enter the thrust area Enter the propulsion speed area 52 ...
Страница 74: ... Enter the Advance Form area Enter the Alert Table area 53 ...
Страница 90: ... 4 2 The maintenance schedule of machine 69 ...
Страница 102: ... Cutting head 81 ...
Страница 103: ... Main jacking device 82 ...
Страница 104: ... Console Electric control cabinet Main pump station 83 ...
Страница 106: ... Appendix A Electrical schematic diagram XDN450 Electrical schematic diagram 85 ...
Страница 107: ... XDN450 Electrical schematic diagram 86 ...
Страница 108: ... XDN450 Electrical schematic diagram 三 87 ...
Страница 109: ... XDN450 Electrical schematic diagram 四 88 ...
Страница 110: ... XDN450 Electrical schematic diagram 五 89 ...
Страница 111: ... XDN450 Electrical schematic diagram 六 90 ...
Страница 112: ... XDN450 Electrical schematic diagram 七 91 ...
Страница 113: ... XDN450 Electrical schematic diagram 92 ...
Страница 114: ... XDN450 Electrical schematic diagram 九 93 ...
Страница 115: ... XDN450 Electrical schematic diagram 94 ...
Страница 116: ... XDN450 Electrical schematic diagram 95 ...
Страница 117: ... XDN450 Electrical schematic diagram 96 ...
Страница 118: ... XDN450 Electrical schematic diagram 三 97 ...
Страница 119: ... XDN450 Electrical schematic diagram 四 98 ...
Страница 120: ... XDN450 Electrical schematic diagram 五 99 ...
Страница 121: ... XDN450 Electrical schematic diagram 六 100 ...
Страница 122: ... Appendix B Hydraulic schematic diagram XDN450 Machine hydraulic schematic diagram 101 ...
Страница 123: ... XDN600 Machine hydraulic schematic diagram 102 ...
Страница 124: ... XDN450 Main top hydraulic schematic diagram 103 ...
Страница 126: ... 105 ...