![XCMG XDN450 Скачать руководство пользователя страница 44](http://html.mh-extra.com/html/xcmg/xdn450/xdn450_operation-manual_882153044.webp)
!
2) Check if the sliding of the top iron is normal.
3) Check if the operation of the globe valve is normal.
3.4.3 mud unit operation inspection
1) Check if the mud line is leakage.
2) Check if the flow of the flowmeter is normal.
3) Check if the hose is distorted or flattened.
4) Check if the delivery of sludge pump is normal.
5) Check if the running of the grouting pump is normal.
6) Check if the mud treatment equipment is normal.
7) Check if the mud mixing device is normal.
3.5 Operation and setting instructions
!
1) network port: it can communicate with computer and man-machine network.
2) man-machine USB: connect to human-machine USB, insert USB portable disk, and send
the jacking record to the disc.
3) computer USB: connect computer USB, you can insert mouse to control computer.
4) head volume: clockwise volume increases and counterclockwise volume decreases.
23
Содержание XDN450
Страница 1: ... Xuzhou Construction Machinery Group Co Ltd XDN450 Pipe Jacking Operation Manual ...
Страница 23: ... 4 Electric control cabinet Unit mm 5 Main pump station Unit mm 2 ...
Страница 24: ... 3 ...
Страница 31: ... machine and construction PLC OMRON Rated voltage AC220V three phase 60Hz Working frequency 60Hz 10 ...
Страница 36: ... Chapter Three Operational Instruction 3 1 Device installation 3 1 1 System structure 15 ...
Страница 40: ... 4 Check if the voltage is 220V 5 The main switch in the electric control cabinet 19 ...
Страница 70: ... 49 ...
Страница 71: ... Enter the X coordinate area Enter the current area 50 ...
Страница 72: ... 51 ...
Страница 73: ... Enter the thrust area Enter the propulsion speed area 52 ...
Страница 74: ... Enter the Advance Form area Enter the Alert Table area 53 ...
Страница 90: ... 4 2 The maintenance schedule of machine 69 ...
Страница 102: ... Cutting head 81 ...
Страница 103: ... Main jacking device 82 ...
Страница 104: ... Console Electric control cabinet Main pump station 83 ...
Страница 106: ... Appendix A Electrical schematic diagram XDN450 Electrical schematic diagram 85 ...
Страница 107: ... XDN450 Electrical schematic diagram 86 ...
Страница 108: ... XDN450 Electrical schematic diagram 三 87 ...
Страница 109: ... XDN450 Electrical schematic diagram 四 88 ...
Страница 110: ... XDN450 Electrical schematic diagram 五 89 ...
Страница 111: ... XDN450 Electrical schematic diagram 六 90 ...
Страница 112: ... XDN450 Electrical schematic diagram 七 91 ...
Страница 113: ... XDN450 Electrical schematic diagram 92 ...
Страница 114: ... XDN450 Electrical schematic diagram 九 93 ...
Страница 115: ... XDN450 Electrical schematic diagram 94 ...
Страница 116: ... XDN450 Electrical schematic diagram 95 ...
Страница 117: ... XDN450 Electrical schematic diagram 96 ...
Страница 118: ... XDN450 Electrical schematic diagram 三 97 ...
Страница 119: ... XDN450 Electrical schematic diagram 四 98 ...
Страница 120: ... XDN450 Electrical schematic diagram 五 99 ...
Страница 121: ... XDN450 Electrical schematic diagram 六 100 ...
Страница 122: ... Appendix B Hydraulic schematic diagram XDN450 Machine hydraulic schematic diagram 101 ...
Страница 123: ... XDN600 Machine hydraulic schematic diagram 102 ...
Страница 124: ... XDN450 Main top hydraulic schematic diagram 103 ...
Страница 126: ... 105 ...