Release 2.1
35
Section 2. Installation
Introduction
This section provides recommendations and procedures for inspecting, installing,
and testing the power supply.
Basic Setup Procedure
See Table 2.1 for a summary of the basic setup procedure and an overall view of the
subsections in Section 2. Use the procedure as a quick reference if you are familiar
with the installation requirements for the power supply. If you want more
information, each step in the procedure refers to subsequent sections which contain
more details. Execute each step in the sequence given.
Table 2.1
Basic Setup Procedure
See Section 3. Local Operation for instructions about front panel operation, OVP,
OTP, shutdown, and using multiple supplies. You will find remote programming and
monitoring described in Section 4. Remote Operation.
Step # Description Action
Reference
1
Inspection
Perform an initial physical
inspection of the supply.
“Inspection, Cleaning, and
Packaging” on page 36
2
Installation
Install the supply (bench or rack
mount), ensuring adequate
ventilation.
“Location, Mounting, and
Ventilation” on page 39
3
Input Power
Connect AC input power.
“AC Input Power” on
page 40
4
Test
Perform functional tests for
voltage mode operation, current
mode operation, and front panel
controls.
“Functional Tests” on
page 43
5
Load
Connect the load.
“Load Connection” on
page 45
6
Sensing
Connect sensing lines.
“Local and Remote
Sensing” on page 53
Содержание XFR 2800
Страница 2: ......
Страница 3: ...Operating Manual for XFR 2800 Watt Series Programmable DC Power Supply...
Страница 14: ...List of Figures xii Operating Manual for XFR 2 8kW Series Power Supply...
Страница 16: ...List of Tables xiv Operating Manual for XFR 2 8kW Series Power Supply...
Страница 88: ...Calibration Calibrating for Readback Accuracy 86 Operating Manual for XFR 2 8kW Series Power Supply...
Страница 89: ......