Operator Interface
152379 Rev C
2–21
Setting the Date and Time
Follow the procedure below to change the date and time.
To change the Date and Time:
1. From the standard display, press the <
M
ENU
> key. This will prompt the user
for the password. The LCD will change the third and fourth lines of the LCD
display as follows:
“
Type and
Hit ENTER
”
“
Password:
”.
2. Enter the password <
5><9><4
> and press the <
E
NTER
> button.
3. Scroll down with the
\/
key until date or time parameters are reached.
a) If you’re changing the date, the third and fourth lines of the LCD will
display as follows:
“
Type and hit ENTER
”
“
Set Date: MMDDYY
”
b) If you’re changing the time, the third and fourth lines of the LCD will
display as follows:
“
Type and hit ENTER
”
“
Set Time: HHMMSS
”
4. Press <
E
NTER
>. Enter the proper date or time in a six digit format.
For
example
:
a) The date is entered month-day-year (mmddyy):
April 28, 2005 is entered
042805
<
E
NTER
>.
b) The time is entered in military hours-minutes-seconds
(i.e., 24-hour clock): 4:30 pm is entered
163000
<
E
NTER
>.
If a mistake is made while entering the date or time, the /\ and \/ keys may be
used as a backspace key. Any two-digit year “YY” may be entered for the
date, but regardless of the keyed entry, the maximum Month/Day “MMDD”
that the UFCU will accept is a “1231” or Dec. 31st. The maximum allowable
time entry the UFCU will accept is “235959”.
5. Once the entry is accepted, the third and fourth lines of the LCD display will
revert back to the following:
a) If you’re changing the date, the third and fourth lines of the LCD will
display as follows:
“
Hit ENTER to set
”
“
Set Date:
”
b) If you’re changing the time, the third and fourth lines of the LCD will
display as follows:
“
Hit ENTER to set
”
“
Set Time:
”
6. Pressing the <
M
ENU
> key will return the user to the standard display.
Содержание PV100S-208
Страница 1: ...PV100S 100 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual PV100S 208 PV100S 480...
Страница 2: ......
Страница 3: ...s PV100S 100 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual...
Страница 8: ...vi...
Страница 14: ...xii...
Страница 22: ...xx...
Страница 78: ...2 38...
Страница 86: ...3 8...
Страница 104: ...5 8...
Страница 109: ...Appendix A Schematics 152379 Rev C A 5 Figure A 1 Electrical Diagram sample...
Страница 110: ...Schematics Appendix A A 6 152379 Rev C Figure A 2 PV100S 480 Schematic for Main Power Distribution 152316 E1...
Страница 111: ...Appendix A Schematics 152379 Rev C A 7 Figure A 3 PV100S 480 Schematic for Control Power Distribution 152316 E2...
Страница 112: ...Schematics Appendix A A 8 152379 Rev C Figure A 4 PV100S 480 Schematic for Converter Control Unit 152316 E3...
Страница 113: ...Appendix A Schematics 152379 Rev C A 9 Figure A 5 PV100S 208 Schematic Main Power Distribution 152376 C1...
Страница 114: ...Schematics Appendix A A 10 152379 Rev C Figure A 6 PV100S 208 Schematic for Control Power Distribution 152376 C2...
Страница 115: ...Appendix A Schematics 152379 Rev C A 11 Figure A 7 PV100S 208 Schematic for Converter Control Unit 152376 C3...
Страница 116: ...Schematics Appendix A A 12 152379 Rev C This page intentionally left blank...
Страница 120: ...Warranty and Return WA 4 152379 Rev C...
Страница 123: ......