Original Operating Instructions
BATD0050-ES-1-400-1
Installation
O_BATD0050-ES-1-400-1_V2.6_GB
Page
43
of
72
3.5.2.5 External Voltage Measuring Device
Required material:
•
Voltage measuring device (not included in scope of delivery)
Procedure:
1.
Locate
the terminal strip (-X3) (Figure 5).
2.
Open
the corresponding cable ducts.
3.
Connect
the cables to the terminal strip (-X3):
o
Phase
L1
to (-X3.11)
o
Phase
L2
to (-X3.12)
o
Phase
L3
to (-X3.13)
o
Neutral conductor
N
to (-X3.14)
4.
Close
cable ducts.
3.5.2.6 External Current Measuring Device
Required material:
•
Current measuring device (not included in scope of delivery)
Procedure:
1.
Locate
the terminal strip (-X3) (Figure 5).
2.
Open
the corresponding cable ducts.
3.
Remove
the cable bridges between terminals:
o
(-X3.1) and (-X3.2)
o
(-X3.3) and (-X3.4)
o
(-X3.5) and (-X3.6)
4.
Connect
the measuring devices to the following terminals:
o
For phase
L1
between (-X3.1) and (-X3.2)
o
For phase
L2
between (-X3.3) and (-X3.4)
o
For phase
L3
between (-X3.5) and (-X3.6)
5.
Close
cable ducts.