Original Operating Instructions
BATx0280-ES-1-400-1 (Outdoor)
Installation
O_BATx0280-ES-1-400-1_(Outdoor)_V1.3_GB
Page
30
of
69
3.5.1 Required Connections
The following cables and lines must be prepared and in flawless condition, safe and
de-energized:
•
•
AC Connection (Section 3.5.1.2)
•
DC Connection (Section 3.5.1.3)
•
Supply Voltage (Section 3.5.1.4)
•
Data Communication (Section 3.5.1.5)
•
Option Island Grid Function (Section 3.5.1.6)
Содержание BAT 0280-ES-1-400-1 Series
Страница 69: ......