![Worcester greenstar heatslave 18 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/worcester/greenstar-heatslave-18/greenstar-heatslave-18_instruction-manual_996503019.webp)
IN
S
TA
LL
AT
IO
N
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH
17
UNPACKING THE BOILER
8-716-106-252a (03.05)
IMPORTANT: All the previous Pre-Installation sections must be read and
requirements met before starting boiler or flue installation.
UNPACKING THE BOILER
Unpacking:
1 Cut the ties securing the carton to the pallet
taking care not to pierce the carton or cause
personal injury
2 Lift carton up and away from the boiler
Remove the plastic bag and upper front
protection cover from the boiler and place safely
aside
3 Pull base of front panel (E) away from the
boiler to disengage ball stud connectors
Lift front panel (E) upwards off the top
supporting ledge and store safely away from the
working area
4 Remove the bolts securing the boiler to the
transport pallet
At least two or more persons are required to
remove the boiler from the pallet taking care not
to damage the boiler, panels or the floor.
At all times the correct method for handling
heavy objects should be strictly observed.
GENERAL HANDLING GUIDELINES:
Lift only a manageable weight, or ask for help.
When lifting, bend the knees, and keep the back
straight and feet apart.
Do not lift and twist at the same time.
Lift and carry items close to the body
Wear protective clothing and gloves to protect
from any sharp edges.
3
1
2
E
4