Supplied By www.heating spares.co Tel. 0161 620 6677
LAYOUT OF BOILER
8 716 115 748 (2009/09)
10
2.4
HIGHFLOW CDi COMBI BOILER
Fig. 7
Highflow CDi boiler, controls in service position
Fig. 8
Highflow CDi control panel
1
Cover - installer module
2
Heat store
3
Pressure relief valve
4
Auto air vent
5
Flue gas sampling point
6
Primary sensor
7
Flue blanking plate
8
Fan
9
Ignition electrodes & flame sensing electrode
10
Heat exchanger
11
Heat exchanger access panel
12
Air/Gas adjustment screw
13
Expansion vessel
14
Gas valve
15
Condensate pump assembly
16
Circulating pump
17
Optional filling link
18
Runner wheels on mounting frame
19
CH return isolating valve
20
Mains water inlet isolating valve
21
Gas isolating valve
22
DHW outlet
23
CH flow isolating valve
24
DHW sensor
25
Boiler/tank drain & connection point for filling link
26
Flow turbine
27
Filling link isolating valve
28
DHW heat exchanger
29
Tank overheat thermostat
30
Tank temperature sensor
31
Control panel
32
Display
33
System pressure gauge
34
Reset button
35
ECO button
36
Not used
37
DHW temperature control
38
Position of optional controller
39
Mains ON/OFF indicator & fault diagnostic light (blue)
40
CH temperature control
41
CH boost button
42
Service button
43
Burner ON indicator light (green)
44
Master ON/OFF switch
1
2
3 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
8 7 1 6 11 5 7 4 8 - 0 3 . 1 Wo
8716115748-06.1Wo
32
33
34
35
36
37
38
39
40
41
42
43
44