Commissioning
DANGER - HIGH VOLTAGE
When commissioning the control, please observe all safety rules that apply to the handling of live
equipment. Ensure that you know how to provide first aid in the event of an uncontrolled release of en-
ergy and that you know where the first aid kit and the nearest telephone are. Never touch any live com-
ponents of the system or on the back of the system.
L I F E T H R E A T E N I N G
WARNING
Only a qualified technician may commission unit. The "EMERGENCY-STOP" function must be opera-
tional prior to commissioning of the system, and must not depend on the unit for its operation.
CAUTION
Prior to commissioning ensure that all measuring devices are connected in correct phase sequence.
The connect command for the unit circuit breaker must be disconnected at the unit circuit breaker. The
field rotation must be monitored for proper rotation. Any absence of or incorrect connection of voltage
measuring devices or other signals may lead to malfunctions and damage the unit, the engine, and/or
components connected to the unit!
Procedure
1.
Disconnect the close command connections at the power circuit breaker.
2.
After checking the unit wiring and ensuring all voltage-measuring devices are phased correctly, apply the
control system voltage (i.e. 12/24 Vdc).
3.
Before accessing the configuration mode, make sure to reset the discrete input "configuration locked"
(connect to 0 V or disconnect). By simultaneously pressing the two push buttons "Digit
↑
" and "Cur-
sor
→
", the configuration mode is accessed. After entering the access code number, the unit may be con-
figured according to the application requirements (see the chapter regarding the parameters). The "auto-
matic" LED will darken when in the configuration mode.
4.
Set all parameters according to Chapter Configuration on page 38. The setting limits can be either read
from the description in the controller display or from the list of parameters at the end of the operating
manual.
5.
After applying the measuring variables, the unit will display the measured values. These values should be
confirmed with a calibrated measuring instrument.
It is possible to issue an asynchronous close com-
mand in case of an active dead bus start if a measuring voltage has been wired incorrectly or not at
all!
6.
Verify the status of all control and auxiliary inputs and the appropriate LEDs on the display of the control
are illuminated. Verify the status of all control and auxiliary outputs as well as the settings of the control-
ler outputs.