background image

Manual 85204 

ProTech 203 Overspeed Protection System 

 

 

 

Woodward 

31 

Engineering Services 

 
Woodward offers various Engineering Services for our products. For these services, 
you can contact us by telephone, by email, or through the Woodward website. 

 Technical 

Support 

 Product 

Training 

 Field 

Service 

 

Technical Support

 is available from your equipment system supplier, your local Full-

Service Distributor, or from many of Woodward’s worldwide locations, depending 
upon the product and application. This service can assist you with technical 
questions or problem solving during the normal business hours of the Woodward 
location you contact. Emergency assistance is also available during non-business 
hours by phoning Woodward and stating the urgency of your problem. 
 

Product Training

 is available as standard classes at many of our worldwide 

locations. We also offer customized classes, which can be tailored to your needs 
and can be held at one of our locations or at your site. This training, conducted 
by experienced personnel, will assure that you will be able to maintain system 
reliability and availability. 
 

Field Service

 engineering on-site support is available, depending on the product 

and location, from many of our worldwide locations or from one of our Full-
Service Distributors. The field engineers are experienced both on Woodward 
products as well as on much of the non-Woodward equipment with which our 
products interface. 
 
For information on these services, please contact us via telephone, email us, or 
use our website and reference 

www.woodward.com/support

, and then 

Customer Support

 
 

How to Contact Woodward 

 
For assistance, call one of the following Woodward facilities to obtain the address 
and phone number of the facility nearest your location where you will be able to 
get information and service. 
 

Electrical Power Systems 

Facility --------------- Phone Number 

Australia ----------- +61  (2) 9758 2322 
Brazil ------------- +55 (19) 3708 4800 
China ------------ +86 (512) 6762 6727 
Germany: 
 

Kempen --- +49 (0) 21 52 14 51 

 

Stuttgart ----- +49 (711) 78954-0 

India --------------- +91 (129) 4097100 
Japan -------------- +81 (43) 213-2191 
Korea--------------- +82 (51) 636-7080 
 
Poland -------------- +48 12 618 92 00 
United States----- +1 (970) 482-5811 

Engine Systems 

Facility --------------- Phone Number 

Australia ----------- +61  (2) 9758 2322 
Brazil ------------- +55 (19) 3708 4800 
China ------------ +86 (512) 6762 6727 
Germany: 
 
 

Stuttgart ----- +49 (711) 78954-0 

India --------------- +91 (129) 4097100 
Japan -------------- +81 (43) 213-2191 
Korea--------------- +82 (51) 636-7080 
The Netherlands - +31 (23) 5661111 
 
United States----- +1 (970) 482-5811 

Turbine Systems 

Facility --------------- Phone Number 

Australia ----------- +61  (2) 9758 2322 
Brazil ------------- +55 (19) 3708 4800 
China ------------ +86 (512) 6762 6727 
 
 
 
India --------------- +91 (129) 4097100 
Japan -------------- +81 (43) 213-2191 
Korea--------------- +82 (51) 636-7080 
The Netherlands - +31 (23) 5661111 
 
United States----- +1 (970) 482-5811 

 
You can also contact the Woodward Customer Service Department or consult our 
worldwide directory on Woodward’s website (

www.woodward.com/support

for the name of your nearest Woodward distributor or service facility. 
 
For the most current product support and contact information, please refer to the 
latest version of publication 

51337

 at 

www.woodward.com/publications

Содержание ProTech 203

Страница 1: ...Installation and Operation Manual ProTech 203 Overspeed Protection System 9907 146 147 148 149 150 151 Manual 85204 Revision G...

Страница 2: ...that you have the latest revision be sure to check the Woodward website www woodward com pubs current pdf The revision level is shown at the bottom of the front cover after the publication number The...

Страница 3: ...Check out Procedure 4 CHAPTER 3 DESCRIPTION 7 Specifications 7 Modes of Operation 10 Power Supply Description 11 CHAPTER 4 CONFIGURATION AND OPERATION 13 Programming 15 ProTech 203 Programming Workshe...

Страница 4: ...Block Diagram of One Unit of the ProTech 203 System 12 Figure 4 1 ProTech 203 Front Panel 13 Figure 4 2 Method 1 Block Diagram 17 Figure 4 3 Method 2 Block Diagram 18 Figure 5 1 ProTech System Front D...

Страница 5: ...ofoam materials such as plastic or Styrofoam cups cup holders cigarette packages cellophane wrappers vinyl books or folders plastic bottles and plastic ash trays away from the control the modules and...

Страница 6: ...r States relating to electrical equipment designed for use within certain voltage limits ATEX Potentially Declared to 94 9 EEC COUNCIL DIRECTIVE of 23 Explosive March 1994 on the approximation of the...

Страница 7: ...m will still provide the correct output The units functions include the ability to display the actual speed from each speed probe display the highest speed signal on line testing and modular design th...

Страница 8: ...120 Vac dc 9907 150 220 Vac 220 Vac 220 Vac Table 1 3 Voltage Ranges Input Power Requirements Per Kernel 24 Vdc 18 32 Vdc 5 12 W 120 Vac dc 88 132 Vac 12 5 VA 90 150Vdc 4 77 W 220 Vac 180 264 Vac 16...

Страница 9: ...may influence the selection of a location for the device Consider the following general requirements when selecting the location Adequate ventilation for cooling A location that will provide an opera...

Страница 10: ...sible injury or death If the ProTech 203 system is being installed in a hazardous environment please attend to the following warnings EXPLOSION HAZARD Substitution of components may impair suitability...

Страница 11: ...uating equipment that will receive input from the ProTech 203 system to verify that equipment is properly calibrated working correctly properly interfaced and functioning safely before energizing the...

Страница 12: ...ProTech 203 Overspeed Protection System Manual 85204 6 Woodward Figure 2 2 Routing and Stress Relief for Field Wiring Entering the ProTech 203 System...

Страница 13: ...ividual magnetic pickups performs three individual speed calculations and actuates its relay output according to the results of a hardware two out of three vote See Figure 3 1 for the control layout a...

Страница 14: ...he external disconnecting means while the other two subsystems are powered without tripping the prime mover Outputs A separate alarm output and LED indicate if an individual speed sensing unit has tri...

Страница 15: ...European ratings restrict use to applications with voltages not subject to the Low Voltage Directive 73 23 EEC Rated Voltage Resistive 28 Vdc 2 0 A 50Vrms 50 60 Hz 0 3 A UL Ratings Rated Voltage Resis...

Страница 16: ...n the interposing relay is in its de energized state during normal operation TB3 terminals 2 and 3 are connected and TB2 terminals 5 and 6 are connected Only during an actual overspeed trip event is t...

Страница 17: ...speeding one of the speed sensing circuits at a time will not disturb the load Operator Interface Each speed sensing unit of the ProTech 203 system includes a touchpad a two line by 16 character LCD d...

Страница 18: ...ProTech 203 Overspeed Protection System Manual 85204 12 Woodward Figure 3 4 Block Diagram of One Unit of the ProTech 203 System...

Страница 19: ...s recommended that the unit be placed in the PROGRAM mode only during configuration and then placed in the MONITOR mode during normal operation The menu key on the touch pad selects which of the follo...

Страница 20: ...UP ADJ DOWN For integer values these keys increase decrease the displayed value by the power of ten indicated by the cursor position For example if the cursor were under the 0 of the value 5014 and th...

Страница 21: ...o step to the next tunable parameter MPU FAILED SETPOINT 5 Use the CURSOR RIGHT ADJ UP and ADJ DOWN to enter the proper rpm for your preferred MPU FAILED SETPOINT 6 Press the MENU key to step to the n...

Страница 22: ...UT MPU FAILED TIMEOUT MPU FAILED TIMEOUT Time period after a reset during which the prime mover speed must exceed the MPU FAILED SETPOINT or unit will trip MPU GEAR TEETH MPU GEAR TEETH MPU GEAR TEETH...

Страница 23: ...e described below Table 4 2 provides a brief summary of the two start configuration options Method 1 TIMER STARTS ON RESET NO MPU fail timer starts when start key is pressed or when the contact input...

Страница 24: ...lue the unit trips Figure 4 3 Method 2 Block Diagram If the unit is being restarted after a normal rolldown that is there was no trip it should be reset when the turbine is ready to be started again E...

Страница 25: ...dition The peak speed is updated whenever the present speed exceeds the peak speed If an overspeed occurs the unit trips After the trip occurs the peak speed continues to be updated and is stored in n...

Страница 26: ...a trip occurs The trip cause is annunciated as HARDWARE FAULT If this type of fault occurs reset the unit If the fault continues to occur replace the unit and return it for repair If the microcontrol...

Страница 27: ...not applied to an energized to trip ProTech model Apply power to all ProTech units The ProTech device is not connected or is incorrectly connected to the external actuating system Check that the ProT...

Страница 28: ...not functioning Replace the entire unit see User Repairs section below Prime mover won t start One or more de energize to trip units do not have power Check power supply fuses wiring and power sources...

Страница 29: ...boards between units EXPLOSION HAZARD Substitution of components may impair suitability for Class 1 Division 2 Do not disconnect equipment unless power has been switched off or the area is known to be...

Страница 30: ...s Inside the ProTech Device 4 Unplug the power supply board terminal block then unplug the I O board terminal block Figure 5 2 5 Remove the four nuts on the unit s cover and carefully lift the cover o...

Страница 31: ...r to the unit you re replacing HIGH VOLTAGE Failure to disconnect power to the unit you re replacing prior to proceeding can result in exposure to potentially lethal voltage and therefore possible inj...

Страница 32: ...bbon cable from the corresponding display board 10 Remove the six nuts holding the display board to the ProTech system chassis front door Note the nuts locations in Figure 5 4 so that you don t loosen...

Страница 33: ...ws that secure the power supply board to the chassis 6 Plug the ribbon cables back into the power supply board 7 Replace the unit s metal cover To avoid future confusion make sure the proper cover is...

Страница 34: ...ur equipment system documentation for details Woodward Business Partner Support Woodward works with and supports a global network of independent business partners whose mission is to serve the users o...

Страница 35: ...in advance of a scheduled outage to request a replacement control unit If the unit is available at the time of the call it can usually be shipped out within 24 hours You replace your field control un...

Страница 36: ...lowing materials when returning a complete control protective caps on any connectors antistatic protective bags on all electronic modules packing materials that will not damage the surface of the unit...

Страница 37: ...equipment with which our products interface For information on these services please contact us via telephone email us or use our website and reference www woodward com support and then Customer Suppo...

Страница 38: ...gas gaseous steam etc Rating Application Control Governor Information Please list all Woodward governors actuators and electronic controls in your system Woodward Part Number and Revision Letter Contr...

Страница 39: ......

Страница 40: ...t Drake Road Fort Collins CO 80525 USA Phone 1 970 482 5811 Fax 1 970 498 3058 Email and Website www woodward com Woodward has company owned plants subsidiaries and branches as well as authorized dist...

Отзывы: