6. Relay testing and commissioning 

 
The following test instructions should help to verify the protection relay performance before or dur-
ing commissioning of the protection system. To avoid a relay damage and to ensure a correct relay 
operation, be sure that: 
 

 

the auxiliary power supply rating corresponds to the auxiliary voltage on site. 

 

the rated values of the relay correspond to the plant data on site 

 

all signal circuits and output relay circuits are connected correctly. 

 

6.1 Power-On 

 

NOTE! 

Prior to switch on the auxiliary power supply, be sure that the auxiliary supply voltage corresponds 
to the rated data on the type plate. 
Switch on the auxiliary power supply to the relay and check that the message "WW" appears on 
the display and the self supervision alarm relay (watchdog) is energized (Contact terminals D7 and 
E7 closed). 
 

6.2  Testing the output relays 

 

NOTE! 

Prior to commencing this test, interrupt the tripping circuit to the circuit breaker if tripping is not de-
sired. 
By pressing the push button <TRIP> once, the display shows the first part of the software version 
of the relay (e.g. "D08-"). By pressing the push button <TRIP> twice, the display shows the second 
part of the software version of the relay (e.g. "4.01"). The software version should be quoted in all 
correspondence. Pressing the <TRIP> button once more, the display shows "PSW?". Please enter 
the correct password to proceed with the test. The message "TRI?" will follow. Confirm this mes-
sage by pressing the push button <TRIP> again. All output relays should then be activated and the 
self supervision alarm relay (watchdog) be deenergized one after another with a time interval of 1 
second. Thereafter, reset all output relays back to their normal positions by pressing the push but-
ton <SELECT/RESET>. 
 

6.3  Checking the set values 

 
By repeatedly pressing the push button <SELECT/RESET>, all relay set values may be checked. 
Set value modification can be done with the push button <+>< > and <ENTER> (refer to chapter 5). 
 

6.4  Secondary injection test 

6.4.1 Test 

equipment 

 

 

Voltmeter and ammeter with class 1 or better 

 

Auxiliary power supply with the voltage corresponding to the rated data on the type plate 

 

Single-phase voltage supply unit 

 

Timer to measure the operating time (Accuracy class 10 ms) 

 Switching 

device 

 

Test leads and tools 

 

Adjustable resistance (0 - 2201 M

/0.6 W) 

 

 

Содержание MRR1

Страница 1: ...MRR1 Multifunctional Generator Rotor Protection Relay Manual MRR1 Revision A...

Страница 2: ...the right to update any portion of this publication at any time Information provided by Woodward Governor Company is believed to be correct and reliable However no responsibility is as sumed by Woodw...

Страница 3: ...tive functions and assignment of the output relays 15 5 3 1 Blocking of protective functions 15 5 3 2 Assignment of the output relays 16 6 Relay testing and commissioning 17 6 1 Power On 17 6 2 Testin...

Страница 4: ...ver current and ripple detection for diode failure protection 2 Features and characteristics Besides features described in the general MR description MRR1 provides Detection of high impedance earth fa...

Страница 5: ...by relay 5 The relays are allocated to the following contacts Output relay 1 C1 D1 E1 and C2 D2 E2 Output relay 2 C3 D3 E3 and C4 D4 E4 Output relay 3 C5 D5 E5 Output relay 4 C6 D6 E6 Output relay 5 S...

Страница 6: ...Tripping time for insulation resistance trip element s tR red Setting for excitation undercurrent element A Ie green Delay time setting for excitation undercurrent element s tIe red Setting for excita...

Страница 7: ...e LEDs beyond the push button SELECT RESET are lit green during setting and inquiry pro cedure of the setting values which are printed on the left side next to the LEDs The LEDs will light up red afte...

Страница 8: ...or earth ref to connection diagram The low frequency of the test voltage is used to avoid malfunction due to the field to earth capacitance CE which can reach values up to 1 F on large generators The...

Страница 9: ...Manual MRR1 GB Woodward DOK TD MRR1 Rev A 9 Figure 4 2 explains the measuring principle Figure 4 2 Measuring principle...

Страница 10: ...system Table 4 1 Effects of different failures Excitation current supervision The excitation current supervision comprises of three elements under and over current and ripple component measurement Th...

Страница 11: ...ula 100 Typical values for Ir All diodes all right Ir 15 20 One diode open Ir 110 One diode short Ir 200 The setting of Ir should be chosen at about 40 to 50 The tripping time tIr should be instanta n...

Страница 12: ...the display WW appears again Measuring value LED R Insulation resistance green Ie Exciter current green Ir Ripple component of the exciter current green Table 5 1 Measuring values Setting values LED...

Страница 13: ...the pickup value and tripping de lay can be adjusted When the set pickup value is either exceeded or falls below the corresponding LED flashes After elaps of the tripping delay trip of the relay is in...

Страница 14: ...button SELECT RESET for some time approx 3 seconds Electrical reset by applying aux voltage to C8 D8 Software reset software reset has the same effect as the SELECT RESET push button Please also refer...

Страница 15: ...de failure protection By repeatedly pressing the SELECT RESET push button the functions to be blocked are selected one after another The corresponding LED lights up simultaneously The display shows BL...

Страница 16: ...element When the display shows _ _ _ _ no alarm relay is assigned to this element The assignment of output relays 1 4 can be changed by pressing and push buttons The selected assignment can be stored...

Страница 17: ...shows the first part of the software version of the relay e g D08 By pressing the push button TRIP twice the display shows the second part of the software version of the relay e g 4 01 The software ve...

Страница 18: ...t circuit For checking the measuring values a current must be injected terminals B1 B2 which is below the set pickup current of the MRR1 After renewed pressing the SELECT RESET push button measuring v...

Страница 19: ...ources above described Since the cost and potential hazards are very high for such a test especially if staged fault tests are in tended these tests are usually limited to very important protective re...

Страница 20: ...nuous current 20 A DC Nominal current IN 10 A DC measuring range up to 25A DC Power consumption in current circuit 1 VA 7 2 Common data Dropout to pickup ratio 98 Returning time 30ms Minimum operating...

Страница 21: ...value Tripping delay for R tR 1 50 sec EXIT 0 1 0 2 0 5 1 0 3 or 0 2 2 s Pickup value of ex citer undercurrent element Ie EXIT 0 2 20 A 0 05 0 1 0 2 0 5 2 of setting value or 0 01A Tripping delay for...

Страница 22: ...Woodward Manual MRR1 GB 22 DOK TD MRR1 Rev A 7 5 Order Form Rotor earth fault relay MRR1 Housing 12TE 19 rack Flush mounting A D Technical data subject to change without notice...

Страница 23: ...ercurrent element A 0 50 tIe Tripping delay for I s 0 10 Ie Pickup value exciter over current element A 5 00 tIe Tripping delay for I s 0 1 Ir Pickup value for ripple voltage supervision 50 tIr Trippi...

Страница 24: ...ermany Postfach 10 07 55 P O Box D 47884 Kempen Germany Phone 49 0 21 52 145 1 Internet www woodward com Sales Phone 49 0 21 52 145 216 or 342 Telefax 49 0 21 52 145 354 e mail salesEMEA_PGD woodward...

Отзывы: