
Manual 35076
LESV II
Woodward
2
Response Time Data .................................................................................................................................. 54
Limitations ................................................................................................................................................... 54
Management of Functional Safety .............................................................................................................. 54
Restrictions ................................................................................................................................................. 54
Competence of Personnel ........................................................................................................................... 54
Operation and Maintenance Practice .......................................................................................................... 54
Installation and Site Acceptance Testing .................................................................................................... 55
Functional Testing after Initial Installation ................................................................................................... 55
Functional Testing after Changes ............................................................................................................... 55
Proof Test (Functional Test) ........................................................................................................................ 55
Functional Verification (Proof) Test Procedure (Module Level) .................................................................. 55
C
HAPTER
8.
P
RODUCT
S
UPPORT AND
S
ERVICE
O
PTIONS
.............................................................. 56
Product Support Options ............................................................................................................................. 56
Product Service Options ............................................................................................................................. 56
Returning Equipment for Repair ................................................................................................................. 57
Replacement Parts ...................................................................................................................................... 58
Engineering Services .................................................................................................................................. 58
Contacting Woodward’s Support Organization ........................................................................................... 58
Technical Assistance .................................................................................................................................. 59
R
EVISION
H
ISTORY
....................................................................................................................... 60
D
ECLARATIONS
............................................................................................................................ 61
Released
Содержание Large Electric Sonic Valve II
Страница 14: ...Manual 35076 LESV II Woodward 12 Figure 1 1 Optional SIL2 Flow Sensor 3 4 6 inch LESV II Released...
Страница 15: ...Manual 35076 LESV II Woodward 13 Figure 1 2a Outline Drawing 2 Inch LESV II UHR SST 600 Dual Resolver Released...
Страница 16: ...Manual 35076 LESV II Woodward 14 Figure 1 2b Outline Drawing 2 Inch LESV II UHR SST 600 Dual Resolver Released...
Страница 17: ...Manual 35076 LESV II Woodward 15 Figure 1 3a Outline Drawing 3 Inch LESV II Class 600 Released...
Страница 18: ...Manual 35076 LESV II Woodward 16 Figure 1 3b Outline Drawing 3 Inch LESV II Class 600 Released...
Страница 19: ...Manual 35076 LESV II Woodward 17 Figure 1 4a Outline Drawing 4 Inch LESV II Class 600 Released...
Страница 20: ...Manual 35076 LESV II Woodward 18 Figure 1 4b Outline Drawing 4 Inch LESV II Class 600 Released...
Страница 21: ...Manual 35076 LESV II Woodward 19 Figure 1 5a Outline Drawing 6 Inch LESV II Class 600 Released...
Страница 22: ...Manual 35076 LESV II Woodward 20 Figure 1 5b Outline Drawing 6 Inch LESV II Class 600 Released...
Страница 40: ...Manual 35076 LESV II Woodward 38 Figure 3 11 Cable Motor Resolver 1 Feedback Signal Released...
Страница 41: ...Manual 35076 LESV II Woodward 39 Figure 3 12 Cable Stem Shaft Resolver LVDT Feedback Signal Released...
Страница 42: ...Manual 35076 LESV II Woodward 40 Figure 3 13 Cable Motor Resolver 2 Feedback Signal Released...
Страница 43: ...Manual 35076 LESV II Woodward 41 Figure 3 14 Cable Motor Power 2 Inch LESV II LELA1 with DVP5k Released...
Страница 63: ...Manual 35076 LESV II Woodward 61 Declarations Released...
Страница 64: ...Manual 35076 LESV II Woodward 62 Released...
Страница 65: ...Manual 35076 LESV II Woodward 63 Released...