Rev 6.2/2-20
MRT4-DC3: #35068
1
SPECIFICATIONS .....................................................................................3
SAFETY...................................................................................................5
OPERATING FEATURES............................................................................6
ASSEMBLY..............................................................................................7
..................................................9
Installing/Removing Extension Arms and Repositioning Vacuum Pads ............................10
Using Secondary Rotation Stops .......................................................................................11
INTENDED USE .....................................................................................12
...............................................................................12
..........................................................................13
.............................................................................13
...........................................................................14
Taking Safety Precautions .................................................................................................14
Selecting a Screen Language.............................................................................................14
Performing Inspections and Tests .....................................................................................15
Checking the 12-Volt Battery ............................................................................................15
Preparing to Use the Remote Control System ..................................................................16
..................................................................17
Positioning the Lifter on the Load.....................................................................................17
Powering up the Lifter ......................................................................................................18
Sealing the Pads on the Load ............................................................................................18
Reading the Vacuum Gauges ............................................................................................19
......................................................................20
Interpreting the Lift Light..................................................................................................20
Watching Vacuum Indicators ............................................................................................20
Controlling the Lifter and Load .........................................................................................21
In Case of a Power Failure.................................................................................................21
.................................................................................22
......................................................................................23
.........................................................25
.............................................................................26
TABLE OF CONTENTS
Содержание MRT410LDC3
Страница 2: ...MRT4 DC3 35068 Rev 6 2 2 20 2 ...
Страница 6: ...MRT4 DC3 35068 Rev 6 2 2 20 4 SPECIFICATIONS Note A standard MRT411LDC3 is shown ...
Страница 11: ...Rev 6 2 2 20 MRT4 DC3 35068 9 TO CHANGE THE PAD FRAME CONFIGURATION ASSEMBLY ...
Страница 44: ...MRT4 DC3 35068 Rev 6 2 2 20 42 ...
Страница 45: ...Rev 6 2 2 20 MRT4 DC3 35068 43 ...
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......