OPERATION
TVS Setup
Operation
MHdoc031116
2-6
2
The power supply must meet the specifications given in the table below.
IMPORTANT!
When starting the machine for the first time, check that
the blade rotation direction is as indicated by the arrow located on the
blades covers. If the rotation direction is incorrect, invert the phases in
the phase inverter located in the power socket (electric box). Setting
the phases in the phase inverter correctly will ensure correct rotation
directions of all machine motors (machines not equipped with phase
failure relay). If your machine is equipped with phase failure relay,
motors will not start until the phase are not set properly.
IMPORTANT!
When starting the machine for the first time, let it run
without any load for 1-2 hours. It will let the infeed and outfeed tables
drive components grind in.
DANGER!
It is recommended that a 30mA Ground Fault Interrupter
(GFI) be used.
The resaw can be lifted using a forklift only. The forklift must be rated for at least 2000kg
(4409 lb).The saw is equipped with forklift pockets. Insert the forks into the pockets shown on
3-Phase
Volts
Fuse
Disconnect
Suggested Wire Size
400 VAC
40 Amps
11 AWG / 4 mm
2
, up to
15 m/ 49 ft long
TABLE 2-1
!
!
Содержание TVSE11S - SC
Страница 1: ......
Страница 2: ......
Страница 24: ...OPERATION TVS Setup 2 2 7 MHdoc031116 Operation the pictures below FIG 2 2 FIG 2 2 tvs_184A...
Страница 49: ...Troubleshooting Setworks Malfunction Troubleshooting TVS_SWdoc031116 4 2 4 PHOTO 4 1 Sensor Adjustment Bolts 4...
Страница 51: ...Troubleshooting Setworks Malfunction Troubleshooting TVS_SWdoc031116 4 4 4 PHOTO 4 3 PHOTO 4 4...
Страница 52: ...Troubleshooting Setworks Malfunction 4 4 5 TVS_SWdoc031116 Troubleshooting PHOTO 4 5...
Страница 80: ...ALIGNMENT Blade Wheel Alignment 6 6 8 MHdoc031116 See Figure 6 9 FIG 6 9 tvs_202_A Alignment Bracket Rope...
Страница 102: ...ALIGNMENT Installation of Tables 6 6 30 MHdoc031116 See Figure 6 27 FIG 6 27 400 600mm Level Adjustment Bolts...