SETUP & OPERATION
Preparing The Sawmill For Towing
2
2-26
25doc092506
SETUP & OPERATION
CAUTION!
Check to be sure that the carriage safety chain
is secured before towing the sawmill. Failure to properly
secure the cutting head can result in severe machine dam-
age. Be sure the blade housing cover is in place and
secured.
8.
Remove all loose objects from the bed of the mill. Store the cranks for toe boards in the
brackets provided at the rear of the mill. Store the outrigger jack handle in the bracket on
the outrigger guide.
9.
Place both fenders in the slots located behind the trailer tires. Raise all but the very front
outrigger.
See the trailer operator’s manual for specific information regarding hitch operation and
towing the sawmill.