Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation
60HDdoc011304
4-21
4
CAUTION!
Move the hydraulic clamp and turner to provide
maximum ground clearance before towing. Failure to do so
may result in damage to the sawmill.
3.
Move the carriage forward to the travel position over the rear bed rail.
4.
Position the hole in the saw head over the travel rest pin.
5.
Lower the saw head until it is seated firmly on the rest pin.
6.
Secure the rest pin in the vertical position with the locking pin.
See Figure 4-8.
7.
Continue lowering the head 3/4" (19mm) until it contacts the stop blocks on the mast rails.
CAUTION!
It is important that the lower stop bolts are prop-
erly adjusted to secure the carriage on the track rail. Failure
to properly adjust the stop bolts can cause saw head dam-
age, especially during mill transportation.
FIG. 4-8
HD0075
Rest Pin
Lock Pin