![Wood-mizer LMS-HPR Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/wood-mizer/lms-hpr/lms-hpr_safety-installation-operations-and-service_994550009.webp)
Installation
Control Box Installation
Installation
LMS99doc032619
1-6
1
See Figure 1-3.
Refer to the appropriate wiring diagram while performing the wiring steps below.
3.
Connect the red LubeMizer wire #250 to the short red wire connected to terminal #3 of
the power feed drum switch.
4.
Connect red LubeMizer wire #251 to red sawmill control harness wire #19 (clear #41 on
sawmills before 9/04).
5.
Connect blue LubeMizer wire #257 to black sawmill control harness wire #20 (black #42
on sawmills before 9/04).
6.
Connect black LubeMizer wire #259 to the ground stud terminal in the control box.
7.
Using the existing mounting bolts, install the lube control assembly to the sawmill control
box. Replace the rear control box panel.
FIG. 1-3
LubeMizer Control
Assembly
Remove Rear and Left
Control Box Panels
3H0430-1