4
Please reference figures 1-1,2,3,4 and 5 for more
information on installation.
Step 1: Place the dehumidifier at the center of the
long wall with the inlet filter facing the board pile.
Step 2: Connect an appropriate length drain hose as
shown in Figure 1-1.The drain must have a trap.
The dehumidifier can be elevated any reasonable
amount to help the drain gravity feed. If the drain
hose extends outside (not to a floor drain in the kiln)
the wall opening should be sealed around the hose.
Never have a floor drain.
Step 3: Place the controller at a convenient point
outside the chamber near the dehumidifier.
Step 4: Remove the cover
Step 5: Drill holes in the kiln wall to allow control
cables and separately the sensor wires (inside the
controller) to be carefully routed into the chamber.
Do not route control and sensor wires through the
same hole.
Step 6: Mount the Dry Bulb Temperature Sensor 6 to
12 inches from the wall 4 feet off the floor, at least 3
ft from kiln unit, away from the blower outlet, for an
accurate reading.
Step 7: Remove the right side panel of the
dehumidifier gaining access to the compressor and
terminal strip.
Step 8: Securely connect the control cable to the
dehumidifier.
Step 9: Carefully connect each wire to their
corresponding terminal. Do not stretch or over stress
the cable.
Wire insulation is marked with the corresponding
terminal number.
Step 10: Seal holes after wires are installed to keep
moisture from the control box. Seal the holes in the
kiln wall.
Step 11: Install the fans in locations over the lumber
see figures 1-1,2,3,4 and 5 as a reference.
Step 12: Install and caulk the vents so that they are
on opposite sides of the fans and at opposite ends of
the kiln.
The vents should be located as shown on the
chamber drawings.
Step 13: With the system switch in OFF position,
plug in the power cable (the special receptacle for
the
KD150
is supplied by
Wood-Mizer
).
Equipment Installation
Wood-Mizer
KD150 12/22/17
Содержание KD150 Series
Страница 2: ...KD150 12 22 17 ...
Страница 6: ...Service Log Issue Description Date Servicer KD150 12 22 17 ...
Страница 15: ...9 Figure 1 5 Kiln Chamber Wall Details Wood Mizer KD150 12 22 17 ...
Страница 16: ...10 Figure 1 6 Kiln Chamber Front Elevation Wood Mizer KD150 12 22 17 ...
Страница 17: ...11 Figure 1 7 Kiln Chamber Door Framing Wood Mizer KD150 12 22 17 ...
Страница 18: ...12 Figure 1 8 Kiln Chamber Door Section E Wood Mizer KD150 12 22 17 ...
Страница 19: ...13 Figure 1 9 Kiln Chamber Door Section F Wood Mizer KD150 12 22 17 ...
Страница 21: ...15 Figure 1 11 Door Gasket Installation GASKETS AND DOOR KITS AVAILABLE Wood Mizer KD150 12 22 17 ...
Страница 47: ...41 Notes Wood Mizer KD150 12 22 17 ...