31
3062880_0910
Commissioning report
Commissioning steps
Test value or confirmation
1.) Gas type
Natural gas H
□
LPG
□
Wobbe index ___________ kWh/m³
Calorific value, heating ___________ kWh/m³
2.) Gas supply pressure checked?
□
3.) Gas leak test carried out?
□
4.) Balanced flue system checked?
□
5.) Water connections checked for leaks?
□
6.) Siphon filled?
□
7.) Has the system been filled in acc. with the technical
information regarding water treatment?
□
8.) Boiler and system vented?
□
9.) System pressure 1.5 - 2.5 bar?
□
10.) Entered gas type and output onto label?
□
11.) Function test carried out?
□
12.) Flue gas test
Gross flue gas temperature
Inlet air temperature
Net flue gas temperature
Carbon dioxide content (CO
2
) or oxygen content (O
2
)
Carbon monoxide content (CO)
_____________ t
A
[°C]
_____________ t
A
[°C]
_____________ (t
A
- t
L
) [°C]
_____________ %
_____________ ppm
13.) Casing fitted?
□
14.) System user trained, documentation handed over?
□
15.) Confirm commissioning?
_____________
□