4
3060918_1203
Standards / Regulations
Standards and regulations
Observe all current Building Regulati-
ons and other local requirements.
Only recognised heating contractors may
install WOLF boilers. This heating contrac-
tor will also be responsible for the proper
installation and the commissioning of the
heating system.
The boilers described in these installation
instructions are low temperature boilers
according to HeizAnlV and 92/42/EEC
(Efficiency of Hot Water Boilers).
Locate the enclosed operating instructions
in a clearly visible position in the boiler
room.
Boilers may only be installed and ope-
rated in boiler rooms which are suitable
according to the Landes-FeuVo [or local
regulations].
The following regulations, rules and guide-
lines must be observed during installation:
• Boiler room guidelines or Building Regu
-
lations relating to the construction and
installation of central boiler rooms and
fuel storage facilities.
• Energy Savings Act (EnEG) and related
directives (Heating Systems Order).
Note: Please read these instructions
carefully before the installation
and keep them in a secure place.
• DIN standards
DIN 1988 Technical rules for DHW
installations
DIN 4701 Rules for
calculating the heat
demand of buildings
DIN 4751 Part 3 - Safety Equipment
for heating systems with flow
temperatures up to 95 °C.
DIN 18160 Domestic chimneys
• VDE requirements:
VDE 0100 General information
regarding the installation of
HV systems with rated
voltages up to 1000V.
VDE 0105 Operation of HV
systems, general
considerations.
VDE 0722 Electrical equipment of
non-electrically heated
heat generators.
VDE 0470/ Protection through
housings
EN 60529
EN 60335-1 Safety of electrical
equipment for domestic
use and similar purposes.