Commissioning steps
Test values or confirmation
1.)
Fuel oil
Standard EL
Low sulphur EL
Bio-oil B10
2.)
Oil leak test carried out?
3.)
Air/flue system checked?
4.)
Water connections checked for tightness?
5.)
Trap filled?
6.)
Boiler and system vented?
7.)
System pressure 1.5 - 2.5 bar?
8.)
Function test carried out?
9.)
Flue gas test:
Flue gas temperature gross
Inlet air temperature
Flue gas temperature net
Carbon dioxide content (CO
2
) or oxygen content (O
2
)
Carbon monoxide content (CO)
Soot value.
__________________ t
A
[°C]
__________________ t
L
[°C]
__________________ (t
A
- t
L
) [°C]
__________________ %
__________________
ppm
__________________
10.)
Casing fitted?
12.)
Control parameters checked?
11.)
System user instructed; documentation handed over?
12.)
Commissioning confirmed?
Date: ____________________________
Signature: ________________________
34 Commissioning report