Original operation manual
33
AirlessPhoenixGX_BA_en_1803 • 0550010-en • jw
Operation
5 Operation
➤
The machine must be correctly installed and fully assembled.
➤
Only put the machine into operation if you are equipped with the
prescribed personal protective equipment. Details on this can
be found in 2.5.4 ‘Personal protective equipment’ on page 21.
➤
The spraying material must be available in sufficient quantity.
Observe the safety data sheet of the material manufacturer.
You will need 2 collecting vessels for surplus material.
These containers are not included in the scope of delivery.
WARNING
If fluid pumps run dry, this can lead to fire or an explosion due to
the resulting friction heat.
➤
During operation ensure that the drums never run empty.
Never leave the machine running when unattended.
➤
However, if this were to happen, bring the respective pump to
an immediate standstill and add material.
5.1 Putting the machine into operation
➤
Properly ground the machine and the object to be coated
(see chap. 4.3.2 on page 32).
➤
Check if all safety features are present and fully functional
(see 2.4 ‘Safety features’ on page
17
).
➤
Check the release agent level in the pump and top it off if
necessary (see
6.3.2 ‘Filling the release agent and checking the
fill level’ on page 43).
➤
Flush the machine (see 5.3 ‘Flushing’ on page 36) in order
to flush out the factory-made test substance (during initial
commissioning) or the remains of the previous spraying material.
➤
During commissioning (flushing), check that all machine parts
are leak-tight and tighten the connections if necessary.