Original instructions 

 

h)

 

the  alarm  device,  when  activated, 
operates correctly; 

i)

 

the  mechanical  blocking  device  is 
provided and effective; 

j)

 

triggering of overload detection device 
operates correctly (rated load + 75 kg); 

k)

 

undergo without failure a dynamic test, 
with the maximum working load at the 
rated speed; 

l)

 

undergo 

without 

permanent 

deformation  a  static  test  with  rated 
load multiplied by a coefficient of 1,25; 

 

Especially, please check carefully the following 
items: 
 

4.3.2.

 

Machinery spaces 

 
The  following  examinations  and  test  must  be 
done: 
 

Regulatory plates 

Check  that  the  danger  nameplate  is  present 
and  visible  in  the  machine  room  door  or,  if 
there is no machine room, near the machinery 
cabinet,  so  as  to  the  operating  instructions  of 
the platform. 
 
Also check that all the relevant materials (such 
as  pump  unit,  cylinder,  safety  gear,  controller, 
etc.)  have  the  correspondent  nameplates  with 
the 

serial 

number, 

model, 

name 

of 

manufacturer, technical characteristics, etc. 
 

Machinery cabinet 

It must have imperforate walls, floor, roof and 
door.  It must have ventilation outlets. 

 
Machine room door lock 

The  machine  room  door  or,  in  case,  the 
machinery  cabinet,  must  have  an  access  key 
and  must  be  closed  and  locked  without  that 
key.    Both  machine  room  door  and  machinery 
cabinet door must open on the outer direction.  
 

Ventilation 

The  machine  rooms  and  cabinets  must  have 
enough  ventilation  outlets.    In  case  of 

machinery  cabinets,  these  must  be  done  in  a 
way  that  assures  enough  protection  against 
dust, humidity and toxic gases. 
 

Lighting and power supply 

The  lighting  must  assure  in  the  work  zones  at 
least  200  lux  at  floor  level.    Check  that  the 
power  supply  for  car  and  well  is  independent 
of the one for the drive. 
 

Hand pump lever 

In  hydraulic  platforms  a  hand  pump  must 
allow  to  move  the  car  upwards.    This  device 
must be permanently installed in all platforms 
with safety gear or blocking device. 
 
Check  that  the  drive  unit  of  hydraulic 
platforms  is  provided  with  a  downward  valve, 
which allows moving the car downwards, even 
in case of power failure.  The car speed cannot 
exceed 0.3 m/s in this operation. 
 

Dimensions 

The  dimensions  of  the  machine  room  or  in 
front  of  the  machinery  cabinet  should  be  big 
enough to accommodate the following spaces: 
 
a)  a  clear  horizontal  area  in  front  of  the 
control  panels  and  the  cabinets.  This  area  is 
defined as follows : 

1)  depth,  measured  from  the  external 
surface of the enclosures, at least 0,7m; 
2)  width,  the  greater  of  the  following 
values  :  0,5  m  or  the  full  width  of  the 
cabinet or panel; 
 

b)  a  clear  horizontal  area  of  at  least  0,5  m  x 
0,6  m  for  maintenance  and  inspection  of 
moving parts at points where this is necessary 
and, if need be, manual emergency operation  
 

Cleanliness 

Check  the  good  state  of  cleanliness  in  both 
machine room or machinery cabinet. 
 

4.3.3.

 

Drive unit 

 
Oil level 

Содержание HHL-W Line

Страница 1: ...Home Lift Elevating platform Test instructions Subject to change without notice EXCELLENCE IN COMPONENTS Date 07 10 2011 Sheet 1 Version 11117320015V02 Approved ISC Original instructions...

Страница 2: ...urpose and scope of application of these instructions 2 Designations and terms 3 Safety advice 4 Description 4 1 Planning and measuring equipment 4 2 Failures Evaluation 4 3 Test methods 4 3 1 General...

Страница 3: ...for braking and holding the car if it is travelling with over speed or if the suspension ropes break Pit The part of the well below the lowest stop that the car stops at Drive Equipment that moves and...

Страница 4: ...lease also be safety conscious and aware of potential hazards The assembly company or service company should eliminate malfunctions that could impair safety Hazard from damaged components The lifting...

Страница 5: ...ation shall be Negative N when the failure represents a serious risk for the user s safety In the relative report see Annexes 1 and 2 to the N qualified points there must be the failures to repair or...

Страница 6: ...Both machine room door and machinery cabinet door must open on the outer direction Ventilation The machine rooms and cabinets must have enough ventilation outlets In case of machinery cabinets these...

Страница 7: ...peed for not exceed 0 15 m s timing the platform travel from the lowest to the higher position and vice versa so that it does not exceed the amount t sec t sec travel m 0 15 m sec Unscrew the screw n...

Страница 8: ...occur 4 3 4 Controller Cabinet fixing Check that the controller cabinet has the suitable fixings to the machine room walls or the machinery cabinet General connections Check that the connections on th...

Страница 9: ...case of power supply failure Alarm Check the correct acting of the alarm button and the telephone system According the EN81 41 check that the phone line is in perfect condition and that the outgoing...

Страница 10: ...ater Hinged support This item will only be necessary for verification when the systems if fitted with a hinged support for ensuring the security space in the pit Check the rigidity of the hinged suppo...

Страница 11: ...he device D The disengaging of the safety gear will be carried out manually placing again the safety clevis This operation will be carried out from the pit safely because the lifting platform is engag...

Страница 12: ...inal examinations and tests before putting into use the platform The Installation Company is the responsible of doing this final test or contracting a Notified Body to do it according to this procedur...

Страница 13: ...f the examiner examination certificate examination N 1 Category type and make or trade name 2 Manufacturer s name and address 3 Name and address of certificate holder 4 Date of submission for examinat...

Страница 14: ...instructions Subject to change without notice EXCELLENCE IN COMPONENTS Date 07 10 2011 Sheet 14 Version 11117320015V02 Approved ISC Original instructions Annex 2 Check list form sample Take the follo...

Отзывы: