Home Lift - Elevating platform
Test instructions
Subject to change without notice!
EXCELLENCE IN COMPONENTS
Date
07/10/2011
Sheet
12
Version
11117320015V02
Approved
ISC
Original instructions
5
Responsibility
The personnel who has done the installation is
the responsible to notify the Assembly
manager the final of on-site jobs, in order to
do the final examinations and tests before
putting into use the platform.
The Installation Company is the responsible of
doing this final test, or contracting a Notified
Body to do it according to this procedure, so as
to notify WITTUR E.C., S.A. across the IE-S-01
model, Final Act of the platform or equivalent.
6
Test report
Once all the previous related tests are done, a
test and examination document which declares
all the information and results of all checks
on-site shall be completed and held by the
installer. See Annex 1 to have a model of this
report.