Test instructions 

 

 Subject to change without notice!

 

EXCELLENCE IN COMPONENTS

 

Date 

 

07/10/2011 

Sheet 

 

Version 

 

11117320015V02 

Approved   

ISC

 

 

Original instructions 

 

3.1.1.2. Defects 

 

 
The lifting platform is defective if: 
 
 

-  the  landing  doors  and  lower  door  guides 
have  running  qualities  diverging  from  the 
general state 
- the car is not in flush position 
- the car displays signals improperly 
- the floor push buttons are not functioning 
- the car push buttons are not functioning 
- the door-open push button is not  
functioning 
- the car lighting does not function fully. 
- the stop accessways are not safe 
- the door reverse equipment does not  
function fully 
 
 

4

 

Description 

 

4.1

 

Planning 

 

Once  the  assembly  works  has  finished,  the 
Installation Company will plan the site visit to 
do the final examinations and tests.  
It will be necessary the use of MULTIMETER for 
the tests detailed in Section 4.3. 

 

 

4.2

 

Defects Evaluation 

 
The  defects  detected  are  evaluated  regarding 
the  risk  they  involved,  in  the  following 
categories (see Annex 2): 
 

P

 

Positive qualification 

N

 

Negative qualification 

 
In  case  of  Positive  qualification  (P),  it  is 
considered that the safety is correct. 
 

The  qualification  shall  be  Negative  (N)  when 
the  failure  represents  a  serious  risk  for  the 
user’s safety. 
 
In the relative report (see Annexes 1 and 2) to 
the  N  qualified  points,  there  must  be  the 
failures to repair or substitute, if needed. 
 

4.3

 

Test method 

 
Please refer to the Annex 2 in order to have a 
checklist  of  the  points  to  test.    These 
examinations  shall  cover  in  particular  the 
following points: 
 
a)  Visual examination of the application of the 
rules of good construction of the components 
for  which  the  standard  has  no  special 
requirements. 
 

b)

 

 Comparison of the details given in the 

verification  of  conformity  for  the  safety 
components,  with  the  characteristics  of  the 
lifting platform. 
 

4.3.1.

 

General tests 

 

Before putting the platform into service, there 
must  be  a  thorough  examination  and  test  in 
accordance with the following: 
 

a)

 

all control devices function correctly; 

b)

 

stopping  distance  of  the  lifting 
platform is within the specified limits; 

c)

 

all  electrical  safety  devices  function 
correctly; 

d)

 

the  suspension  elements  and  their 
attachments are in order; 

e)

 

the  correct  clearance  dimensions  from 
the 

surrounding 

structure 

are 

maintained  throughout  the  full  travel 
of the lifting platform; 

f)

 

the  lifting  platform  shall  be  subjected 
to  electrical  tests  by  instruments  to 
include insulation and earth continuity; 

g)

 

verify 

that 

the 

mechanism 

for 

emergency/manual  operation  operates 
correctly; 

Содержание HHL-W Line

Страница 1: ...Home Lift Elevating platform Test instructions Subject to change without notice EXCELLENCE IN COMPONENTS Date 07 10 2011 Sheet 1 Version 11117320015V02 Approved ISC Original instructions...

Страница 2: ...urpose and scope of application of these instructions 2 Designations and terms 3 Safety advice 4 Description 4 1 Planning and measuring equipment 4 2 Failures Evaluation 4 3 Test methods 4 3 1 General...

Страница 3: ...for braking and holding the car if it is travelling with over speed or if the suspension ropes break Pit The part of the well below the lowest stop that the car stops at Drive Equipment that moves and...

Страница 4: ...lease also be safety conscious and aware of potential hazards The assembly company or service company should eliminate malfunctions that could impair safety Hazard from damaged components The lifting...

Страница 5: ...ation shall be Negative N when the failure represents a serious risk for the user s safety In the relative report see Annexes 1 and 2 to the N qualified points there must be the failures to repair or...

Страница 6: ...Both machine room door and machinery cabinet door must open on the outer direction Ventilation The machine rooms and cabinets must have enough ventilation outlets In case of machinery cabinets these...

Страница 7: ...peed for not exceed 0 15 m s timing the platform travel from the lowest to the higher position and vice versa so that it does not exceed the amount t sec t sec travel m 0 15 m sec Unscrew the screw n...

Страница 8: ...occur 4 3 4 Controller Cabinet fixing Check that the controller cabinet has the suitable fixings to the machine room walls or the machinery cabinet General connections Check that the connections on th...

Страница 9: ...case of power supply failure Alarm Check the correct acting of the alarm button and the telephone system According the EN81 41 check that the phone line is in perfect condition and that the outgoing...

Страница 10: ...ater Hinged support This item will only be necessary for verification when the systems if fitted with a hinged support for ensuring the security space in the pit Check the rigidity of the hinged suppo...

Страница 11: ...he device D The disengaging of the safety gear will be carried out manually placing again the safety clevis This operation will be carried out from the pit safely because the lifting platform is engag...

Страница 12: ...inal examinations and tests before putting into use the platform The Installation Company is the responsible of doing this final test or contracting a Notified Body to do it according to this procedur...

Страница 13: ...f the examiner examination certificate examination N 1 Category type and make or trade name 2 Manufacturer s name and address 3 Name and address of certificate holder 4 Date of submission for examinat...

Страница 14: ...instructions Subject to change without notice EXCELLENCE IN COMPONENTS Date 07 10 2011 Sheet 14 Version 11117320015V02 Approved ISC Original instructions Annex 2 Check list form sample Take the follo...

Отзывы: