Wito CUBE LINE 04-2T Скачать руководство пользователя страница 19

5. Maintenance and Troubleshooting

5. Техническое обслуживание и устранение 

неисправностей

ELECTRICAL HAZARD!

Before carrying out any work on the unit, power the 

unit down to avoid injury from electrical current. Check that 

the unit is isolated and ensure that the appropriate point of 

the unit for the on-site power supply is secured against be-

ing switched back on.

DANGER OF SCALDING!

Before performing work on the valves or the inlet or 

outlet pipes, seal off the heating or cooling medium inlet to 

prevent scalding. Do not commence work before the heating 

medium has cooled down.

DANGER OF ROTATING UNIT PARTS!

Rotating fan wheels can cause injury! Before perform-

ing any work on the unit, ensure that it is powered down. 

Ensure that the appropriate point of the unit for the on-site 

power supply is secured against being switched back on.

5.1. Maintenance

The Cassette fan coil unit CUBE Line is a high-qual-

ity and reliable unit. However, to guarantee the permanent 

functioning  and  performance  of  the  unit,  regular  mainte-

nance and inspection by technical experts is necessary. 

NOTE!

• 

Maintenance may only be performed by trained techni-

cal personnel in observance of this operation manual 

and current regulations.

• 

The manufacturer’s warranty will be invalidated if unit 

damage is attributed to the failure to perform regular 

maintenance and inspections.

• 

The  valid  warranty  prescribes  to  maintain  a  written 

maintenance report. 

The following maintenance tasks must be performed 

at the indicated time intervals.

* Depending on model

5.2. Quarterly maintenance

The filter mat can be cleaned or replaced. It should 

be cleaned dry by a vacuum cleaner operated at medium or 

low capacity stage.

• 

Open the locks of the intake grille and remove the in-

take grille.

Опасность поражения электрическим током!

Перед  выполнением  какой-либо  работы  с  агрегатом, 

выключите питание, чтобы избежать повреждения электрическим 

током.  Проверьте,  что  блок  изолирован  и  убедитесь,  что 

соответствующий главный выключатель электроэнергии надежно 

защищена от включения.

Опасность ожога!

Перед  выполнением  работы  на  клапанах  или  входных/ 

выходных  трубах,  перекройте  подачу  теплоносителя  или 

хладагента,  чтобы  предотвратить  ожог.  Не  начинайте  работы 

пока теплоноситель не охладится.

Опасность 

от 

вращающихся 

частей 

агрегата!

Вращающиеся  рабочее  колесо  вентилятора  может 

причинить повреждение. Перед выполнением какой-либо работы 

на агрегате, убедитесь, что питание отключено. Убедитесь, что 

соответствующий главный выключатель электроэнергии надежно 

защищена от включения.

5.1. Техобслуживание

Кассетный 

фанкойл 

CUBE 

Line 

является 

высококачественным  и  надежным  аппаратом.  Однако,  для 

того,  чтобы  гарантировать  работу  и  должные    характеристики 

оборудования,  необходимо  выполнять  регулярно  техническое 

обслуживание  и  проверку  оборудования  техническими 
специалистами.

ПРИМЕЧАНИЕ!

• 

Техобслуживание 

может 

выполняться 

обученным 

техническим  персоналом  с  соблюдением  этой  инструкции 

по эксплуатации и действующих правил.

• 

Гарантия 

изготовителя 

будет 

недействительной, 

если  повреждение  агрегата  вызвано  не  выполнением 

регулярного технического обслуживания и проверки.

• 

Действующая 

гарантия 

предписывает 

сохранять 

письменный отчет по техническому обслуживанию.

Должны выполнятся следующие операции по техническому 

обслуживанию в указанный интервал времени.

* В зависимости от модели

5.2. Ежеквартальное обслуживание

Фильтр  очищается  или  заменяется.  Его  следует 

очищать  пылесосом,  работающим  на  средней  или  низкой 

производительности

• 

Откройте  затворы  входной  решетки  и  снимите  входную 

решетку.

!

!

!

!

!

!

Component / Компонеты

Maintenance interval / 

Интервал обслуживания

Quarterly / 

Ежеквартально

Annually/ 

Ежегодно

Checking the filter  / Проверка фильтра

+

-

Checking the condensate drain / Проверка стока конденсата

-

+

Checking the screw connections of the medium pipes* / Проверка винтовых соединений труб*

-

+

Checking the electrical connections / Проверка электрических соединений

-

+

Checking the earthing / Проверка заземления

-

+

Checking the heat exchenger* / Проверка теплообменника*

-

+

Checking the lateral condensate tray* / Проверка поперечного конденсатного поддона*

-

+

Checking the setting and functioning of all valves* / Проверка настройки и работы всех клапанов*

-

+

Сassette fan coil CUBE Line

17

5. Maintenance and Troubleshooting

Содержание CUBE LINE 04-2T

Страница 1: ...oil CUBE LINE CUBE LINE WITO Climate control of your business EN RU Model 2 pipe 2 04 2T 05 2T 08 2T 10 2T 14 2T Model 4 pipe 4 04 4T 05 4T 08 4T 10 4T 14 4T Please read this manual before using the f...

Страница 2: ......

Страница 3: ...5 Installation location 4 6 Installation requirement 4 7 Recommended service opening 4 8 Precautions 4 9 Unit mounting 4 10 Panel installation 4 11 Pipe connection 4 12 Valve connection 4 13 Condensa...

Страница 4: ...site power supply is secured against being switched back on DANGER OF SCALDING Before performing work on the valves or the inlet or outlet pipes seal off the heating or cooling water inlet to prevent...

Страница 5: ...risk of explosion In wet areas In locations with high dust levels or aggressive air 2 1 Purpose Fan coils CUBE Line are used for heating cooling dehu midification and ventilation Designed for installa...

Страница 6: ...wise it may cause leakage or work abnormally Please adjust indoor temperature properly especially when there are old people children and patient and so on in the house Lightning and electromagnetic ra...

Страница 7: ...t max W 60 76 132 152 220 Running Current A A 0 27 0 34 0 59 0 67 0 98 Power Supply V Hz 220 230 50 Motor Type 3 speed motor 3 Insulation Class class B B Water Flow l h Cooling 640 860 1220 1570 2170...

Страница 8: ...max W 60 76 132 152 220 Running Current A A 0 27 0 34 0 59 0 67 0 98 Power Supply V Hz 220 230 50 Motor Type 3 speed motor 3 Insulation Class class B B Water Flow l h Cooling 413 533 826 1032 1445 He...

Страница 9: ...OFF Button Press the TIMER OFF button once the previous timer setting will display on the LCD Press the TIMER OFF button continuously the timer will be changed in one minute intervals You can hold on...

Страница 10: ...4 3 4 25 B 48 103 149 90 45 3 4 3 4 25 614 424 D E Model D E CUBE Line 05 2 CUBE Line 08 2 710 mm 125 mm 800 mm 338 mm 737 mm CUBE Line 10 2 CUBE Line 14 2 832 mm 160 mm 950 mm 416 mm 864 mm Dimensio...

Страница 11: ...e 10 4 CUBE Line 14 4 832 mm 100 mm 950 mm 416 mm 864 mm 152 mm 77 mm 43 mm 144 mm 77 mm 90 mm 165 mm 12 4 25 0 5 8 0 6 5 0 5 8 0 6 5 0 C C 112 29 0 A A 105 32 72 142 60 45 60 130 25 I H L M G F B K 3...

Страница 12: ...lled fancoil connection manager fancoil WARNING When you install fancoil without valve it is necessary to remove the jumper S6 Mode is temperature control through the fan S6 wall pad optional step mot...

Страница 13: ...s are found please notify the carrier and request the carrier and the receiver to conduct a joint inspection f Do not repair it yourself before inspection and con firmation by the carrier representati...

Страница 14: ...ere may not be any openings to the outside in the area of the intermediate ceiling The entire intermediate ceiling area must be dry and sufficiently protected against humidity and moist air The intern...

Страница 15: ...ilding ceiling The length dimensions depend on the distance to the in termediate ceiling Push the unit with the terminal box facing front into the intermediate ceiling at an angle until the unit is fu...

Страница 16: ...cable of Signal cable Adjust the panel to make sure the air outlet is well matched with the unit condensate drain pan Tighten the four screws to make sure the panel is tightly matched with indoor uni...

Страница 17: ...en cut off Connect the chilled water pipe to coil pipe by using 3 4 external thread connecter Distinguish the inlet outlet water according to the sign on the unit Heat preservation must be used for th...

Страница 18: ...gulations The connection diagrams do not contain any protective measures During connection the standards and regu lations currently in force must be observed and cleared with the local electricity com...

Страница 19: ...regular mainte nance and inspection by technical experts is necessary NOTE Maintenance may only be performed by trained techni cal personnel in observance of this operation manual and current regulati...

Страница 20: ...connections are securely seat ed in the terminal strips Check the correct earthing of the unit with an appropri ate measuring device Close the electrical switch box again Checking valves Check the fu...

Отзывы: