Wito CUBE LINE 04-2T Скачать руководство пользователя страница 15

b) Determine locations of pipelines and electric wires 

before  installation;  and  adequate  fitting  space  should  be 

reserved. 

c) Make sure hanging structure adequate to support 

the unit weight; 

d) All units shall be leveled to ensure smooth water 

drain and proper operation; 

e) Thermal insulation of chilled water valves and pipe-

lines shall be made by the installer.

4.9. Unit mounting

a)  To  support  the  unit  weight,  anchor  bolt  shall  be 

used in the case of already exists ceiling. For new ceiling, 

use built-in type bolt or parts prepared in the field. Before 

going on installing adjust space between ceilings.

b) The unit is installed under the building ceiling with 

threaded rods to be provided by the customer.

• 

Determine  the  position  of  the  drilled  mounting  holes 

according  to  the  hanging  hook  dimension  in  section 

3.1.-3.2. 

• 

Provide the fixing for the threaded rods with suitable 

tools.

• 

Fasten the threaded rods to the building ceiling. The 

length dimensions depend on the distance to the in-

termediate ceiling. 

• 

Push the unit, with the terminal box facing front, into 

the  intermediate  ceiling  at  an  angle,  until  the  unit  is 

fully placed into the intermediate ceiling. 

• 

Place  the  unit  straight  over  the  opening.  Provisional 

fast installation is possible using the hooks on the sus-

pension lugs. After final positioning fix the straps to the 

unit wall using tapping screws. 

• 

Screw  the  unit  firmly  onto  the  threaded  rods.  Make 

sure that the unit is exactly horizontal.

4.10. Panel installation

NOTE!

 Check whether indoor unit is horizontal with 

leveler or polythene pipe filled with water, and check that the 

dimension of the ceiling opening is correct. Take off the lever 

gauge before install the panel.

The design panel with an air filter is not delivered pre-

assembled. The required mounting material (setscrews) is 

packed separately in a plastic bag. 

• 

Loosen  the  air  intake  grille  by  turning  each  of  the  2 

locks. 

• 

Remove  the  air  intake  grille.  (Refer  to  below  indica-

tion fig)

b) Определите места для трубопроводов и электрических 

кабелей  перед  монтажом;  и  должно  быть  предусмотрено 

соответствующее место для фиттингов.

c) Убедитесь, что подвесная конструкция выдерживает вес 

агрегата. 

d)  Все  узлы  должны  быть  выставлены  по  уровню,  чтобы 

гарантировать дренаж воды и надежную работу оборудования.

e) Термоизоляция клапанов и трубопроводов охлажденной 

воды должна выполняться монтажником.

4.9. Монтаж внутреннего блока

a)  При  существующем  потолке,  для  крепления 

оборудования  используйте  анкерные  болты.  Они  должны 

выдержать вес аппарата. Для нового потолка, используйте болты 

или детали, закрепленые перед монтажом фальшпотолка.

b)  Монтаж  аппарата  под  строительным  потолком  при 

помощи прутков с резьбой (в комплекте  не поставляются):

• 

Определите положение монтажных отверстий по размерам 

крюков для подвешивания, указанным в разделе 3.1.-3.2.

• 

Зафиксируйте 

резьбовые 

прутки 

соответствующим 

инструментом.

• 

Прикрепите  резьбовые  прутки  к  строительному  потолку. 

Длина прутка зависит от расстояния к фальшпотолку.

• 

Подгоните  лицевую  сторону  фанкойла  с  уровнем 

фальшпотолка.

• 

Расположите  агрегат  прямо  над  отверстием.  Временная 

установка возможна с помощью крюка на подвесных лапах. 

После  окончательного  расположения  закрепите  пруток  к 

стенкам агрегата, используя самонарезающие винты.

• 

Закрепите агрегат крепко на резьбовых прутках. Убедитесь, 

что агрегат установлен точно горизонтально.

4.10. Монтаж панели

ПРИМЕЧАНИЕ! 

Проверьте  уровнем  или  при  помощи 

полиэтиленовой  трубки  с  водой,  горзонтальный  уровень 

установки  агрегат.  Проверьте,  что  размер  потолочного  проема 

правилен. Вытащите указатель уровня перед монтажом панели.

Декоративная  панель  с  воздушным  фильтром  не 

поставляется  предварительно  смонтированной.  Необходимые 

монтажные материалы (комплект винтов) упакованы отдельно в 

пластиковом пакете.

• 

Снимите решетку забора воздуха открыв два затворов.

• 

Снимите  решетку  забора  воздуха  (См.  рис.  с  указаниями 

ниже)

Сassette fan coil CUBE Line

13

4. Installation

Содержание CUBE LINE 04-2T

Страница 1: ...oil CUBE LINE CUBE LINE WITO Climate control of your business EN RU Model 2 pipe 2 04 2T 05 2T 08 2T 10 2T 14 2T Model 4 pipe 4 04 4T 05 4T 08 4T 10 4T 14 4T Please read this manual before using the f...

Страница 2: ......

Страница 3: ...5 Installation location 4 6 Installation requirement 4 7 Recommended service opening 4 8 Precautions 4 9 Unit mounting 4 10 Panel installation 4 11 Pipe connection 4 12 Valve connection 4 13 Condensa...

Страница 4: ...site power supply is secured against being switched back on DANGER OF SCALDING Before performing work on the valves or the inlet or outlet pipes seal off the heating or cooling water inlet to prevent...

Страница 5: ...risk of explosion In wet areas In locations with high dust levels or aggressive air 2 1 Purpose Fan coils CUBE Line are used for heating cooling dehu midification and ventilation Designed for installa...

Страница 6: ...wise it may cause leakage or work abnormally Please adjust indoor temperature properly especially when there are old people children and patient and so on in the house Lightning and electromagnetic ra...

Страница 7: ...t max W 60 76 132 152 220 Running Current A A 0 27 0 34 0 59 0 67 0 98 Power Supply V Hz 220 230 50 Motor Type 3 speed motor 3 Insulation Class class B B Water Flow l h Cooling 640 860 1220 1570 2170...

Страница 8: ...max W 60 76 132 152 220 Running Current A A 0 27 0 34 0 59 0 67 0 98 Power Supply V Hz 220 230 50 Motor Type 3 speed motor 3 Insulation Class class B B Water Flow l h Cooling 413 533 826 1032 1445 He...

Страница 9: ...OFF Button Press the TIMER OFF button once the previous timer setting will display on the LCD Press the TIMER OFF button continuously the timer will be changed in one minute intervals You can hold on...

Страница 10: ...4 3 4 25 B 48 103 149 90 45 3 4 3 4 25 614 424 D E Model D E CUBE Line 05 2 CUBE Line 08 2 710 mm 125 mm 800 mm 338 mm 737 mm CUBE Line 10 2 CUBE Line 14 2 832 mm 160 mm 950 mm 416 mm 864 mm Dimensio...

Страница 11: ...e 10 4 CUBE Line 14 4 832 mm 100 mm 950 mm 416 mm 864 mm 152 mm 77 mm 43 mm 144 mm 77 mm 90 mm 165 mm 12 4 25 0 5 8 0 6 5 0 5 8 0 6 5 0 C C 112 29 0 A A 105 32 72 142 60 45 60 130 25 I H L M G F B K 3...

Страница 12: ...lled fancoil connection manager fancoil WARNING When you install fancoil without valve it is necessary to remove the jumper S6 Mode is temperature control through the fan S6 wall pad optional step mot...

Страница 13: ...s are found please notify the carrier and request the carrier and the receiver to conduct a joint inspection f Do not repair it yourself before inspection and con firmation by the carrier representati...

Страница 14: ...ere may not be any openings to the outside in the area of the intermediate ceiling The entire intermediate ceiling area must be dry and sufficiently protected against humidity and moist air The intern...

Страница 15: ...ilding ceiling The length dimensions depend on the distance to the in termediate ceiling Push the unit with the terminal box facing front into the intermediate ceiling at an angle until the unit is fu...

Страница 16: ...cable of Signal cable Adjust the panel to make sure the air outlet is well matched with the unit condensate drain pan Tighten the four screws to make sure the panel is tightly matched with indoor uni...

Страница 17: ...en cut off Connect the chilled water pipe to coil pipe by using 3 4 external thread connecter Distinguish the inlet outlet water according to the sign on the unit Heat preservation must be used for th...

Страница 18: ...gulations The connection diagrams do not contain any protective measures During connection the standards and regu lations currently in force must be observed and cleared with the local electricity com...

Страница 19: ...regular mainte nance and inspection by technical experts is necessary NOTE Maintenance may only be performed by trained techni cal personnel in observance of this operation manual and current regulati...

Страница 20: ...connections are securely seat ed in the terminal strips Check the correct earthing of the unit with an appropri ate measuring device Close the electrical switch box again Checking valves Check the fu...

Отзывы: