NOTE! 

• 

At the beginning of the fitting procedure, remove the 

caps on the water inlet and outlet pipes;

• 

All on-site pipes by others for the cooling water must 

be insulated against condensate formation; 

• 

When all connections have been completed, all screw 

connections  should  be  tightened  and  checked  that 

they are free of mechanical stress.

4.12. Valve connection

The units are supplied without valves, In case of in-

stallation with valves by others, the installation of the water 

inlet and outlet depends on the location of the water connec-

tion and/or the used valves. 

Below showed Fig. indicate the connection of a 2-way 

valve and 3-way valve to the units. In case of 4 pipe system 

two sets water inlet/outlet pipe will need 2 sets of valves.

NOTE! 

In case of installation with motorized valve, 

it is necessary to short-connect the connection port S6 on 

unit PCB; (If no motorized valve, then S6 should be open/

cut off).

• 

Connect the chilled water pipe to coil pipe by using 3/4” 

external thread connecter. 

• 

Distinguish the inlet/outlet water according to the sign 

on the unit. 

• 

Heat preservation must be used for the chilled water 

pipe, and pay attention to the end side management 

of insulate material.

4.13. Condensate water pipe connection

• 

Condensate  pipe  diameter  shall  be  equal  or  larger 

than that of the fitting of the unit. (Size: 25mm)

• 

Drain pipe should be short, with a downward slope at 

least 1/100 to prevent air bag from happening.

• 

If downward slope can’t be made, take other measures 

to lift it up. 

• 

Keep a distance of 1-1.5m between suspending brack-

ets, to make water hose straight.

• 

Use the self-provided stiff pipe and clamp with unit. In-

sert water pipe into water plug until it reaches the white 

tape. Tighten the clamp.

• 

Wind the drain hose using seal pad for installation. 

• 

Insulate drain hose in the room.

ПРИМЕЧАНИЕ

!

• 

В начале процесса монтажа, снимите заглушки на входе и 

выходе патрубков с фанкойла;

• 

Все трубы охлаждающей воды должны изолироваться  для 

избежания образования конденсата;

• 

Когда  все  соединения  будут  собраны,  все  винты  должны 

быть затянуты и проверены.

4.12. Подключение клапана

Агрегаты  поставляются  без  клапанов.  В  случае  монтажа 

с  клапанами,  подключение  подачи  и  обратки  воды  зависит  от 

применяемых клапанов

На  рисунке  ниже  указано  подключение  2-ходового  и  3-х 

ходового клапана к агрегату. В случае 4-х трубной системы и двух 

комплектов водопроводных труб на подачу/обратку, будут нужны 

2 комплекта клапанов.

Примечание! 

В  случае  монтажа  с  электроприводным 

клапаном необходимо быстроразъемное соединение порта S6 на 

агрегате PCB (Если нет электроприводного клапана, то клемма 

S6 должна быть разомкнута).

• 

Подключите  трубу  охлажденной  воды  к  патрубкам 

теплообменника соединителем с наружной резьбой 3/4”.

• 

Различайте  подачу  и  обратку  воды  по  наклейкам  на 

агрегате.

• 

Все  водопроводные  трубы  с  холодной  водой  должны 

теплоизолироваться  и  обратите  внимание  на  концы 

изолирующего материала.

4.13.  Подключение  трубы  для  отвода 

конденсата

• 

Диаметр трубы конденсата должен быть равен или больше, 

чем подключение аппарата (25мм) 

• 

Труба  дренажа  должна  быть  короткой  с  уклоном  вниз 

как  минимум  1/100,  чтобы  предотвратить  образование 

воздушных пробок.

• 

Если уклон вниз не может быть выполнен, примите другие 

меры, чтобы приподнять трубу.

• 

Расстояние между крепежами трубы должно быть 1-1,5 м, 

для обеспечения ровности трубопровода.

• 

Используйте  самоподдерживающуюся  жесткую  трубку  и 

зажим. Оденьте трубку на патрубок и затяните зажим.

• 

Присоедините  дренажный  шланг,  используя  зажимное 

кольцо.

• 

Изолируйте дренажный шланг в помещении.

Сassette fan coil CUBE Line

15

4. Installation

drainage pipe

дренажный патрубок

water inlet

подающий патрубок

water outlet 

обратный патрубок

1-1,5 m

slope over 1/100

уклон 1/100

clamp

self-provided stiff pipe

самоподдерживащаяся труба

зажим

clamp

зажим

1-1,5 m

280 mm

220 mm

300 mm

drain hose

сливной патрубок

Содержание CUBE LINE 04-2T

Страница 1: ...oil CUBE LINE CUBE LINE WITO Climate control of your business EN RU Model 2 pipe 2 04 2T 05 2T 08 2T 10 2T 14 2T Model 4 pipe 4 04 4T 05 4T 08 4T 10 4T 14 4T Please read this manual before using the f...

Страница 2: ......

Страница 3: ...5 Installation location 4 6 Installation requirement 4 7 Recommended service opening 4 8 Precautions 4 9 Unit mounting 4 10 Panel installation 4 11 Pipe connection 4 12 Valve connection 4 13 Condensa...

Страница 4: ...site power supply is secured against being switched back on DANGER OF SCALDING Before performing work on the valves or the inlet or outlet pipes seal off the heating or cooling water inlet to prevent...

Страница 5: ...risk of explosion In wet areas In locations with high dust levels or aggressive air 2 1 Purpose Fan coils CUBE Line are used for heating cooling dehu midification and ventilation Designed for installa...

Страница 6: ...wise it may cause leakage or work abnormally Please adjust indoor temperature properly especially when there are old people children and patient and so on in the house Lightning and electromagnetic ra...

Страница 7: ...t max W 60 76 132 152 220 Running Current A A 0 27 0 34 0 59 0 67 0 98 Power Supply V Hz 220 230 50 Motor Type 3 speed motor 3 Insulation Class class B B Water Flow l h Cooling 640 860 1220 1570 2170...

Страница 8: ...max W 60 76 132 152 220 Running Current A A 0 27 0 34 0 59 0 67 0 98 Power Supply V Hz 220 230 50 Motor Type 3 speed motor 3 Insulation Class class B B Water Flow l h Cooling 413 533 826 1032 1445 He...

Страница 9: ...OFF Button Press the TIMER OFF button once the previous timer setting will display on the LCD Press the TIMER OFF button continuously the timer will be changed in one minute intervals You can hold on...

Страница 10: ...4 3 4 25 B 48 103 149 90 45 3 4 3 4 25 614 424 D E Model D E CUBE Line 05 2 CUBE Line 08 2 710 mm 125 mm 800 mm 338 mm 737 mm CUBE Line 10 2 CUBE Line 14 2 832 mm 160 mm 950 mm 416 mm 864 mm Dimensio...

Страница 11: ...e 10 4 CUBE Line 14 4 832 mm 100 mm 950 mm 416 mm 864 mm 152 mm 77 mm 43 mm 144 mm 77 mm 90 mm 165 mm 12 4 25 0 5 8 0 6 5 0 5 8 0 6 5 0 C C 112 29 0 A A 105 32 72 142 60 45 60 130 25 I H L M G F B K 3...

Страница 12: ...lled fancoil connection manager fancoil WARNING When you install fancoil without valve it is necessary to remove the jumper S6 Mode is temperature control through the fan S6 wall pad optional step mot...

Страница 13: ...s are found please notify the carrier and request the carrier and the receiver to conduct a joint inspection f Do not repair it yourself before inspection and con firmation by the carrier representati...

Страница 14: ...ere may not be any openings to the outside in the area of the intermediate ceiling The entire intermediate ceiling area must be dry and sufficiently protected against humidity and moist air The intern...

Страница 15: ...ilding ceiling The length dimensions depend on the distance to the in termediate ceiling Push the unit with the terminal box facing front into the intermediate ceiling at an angle until the unit is fu...

Страница 16: ...cable of Signal cable Adjust the panel to make sure the air outlet is well matched with the unit condensate drain pan Tighten the four screws to make sure the panel is tightly matched with indoor uni...

Страница 17: ...en cut off Connect the chilled water pipe to coil pipe by using 3 4 external thread connecter Distinguish the inlet outlet water according to the sign on the unit Heat preservation must be used for th...

Страница 18: ...gulations The connection diagrams do not contain any protective measures During connection the standards and regu lations currently in force must be observed and cleared with the local electricity com...

Страница 19: ...regular mainte nance and inspection by technical experts is necessary NOTE Maintenance may only be performed by trained techni cal personnel in observance of this operation manual and current regulati...

Страница 20: ...connections are securely seat ed in the terminal strips Check the correct earthing of the unit with an appropri ate measuring device Close the electrical switch box again Checking valves Check the fu...

Отзывы: