
50100935001_SKS-575(Ver2)Rev.02112012E
Replacement of defective parts
17
7. Replacement of defective parts
7.1 Before starting work
1.
Make sure that the complete electrical system is de-energised and that it cannot
be switched on again accidentally.
2.
Wait until the searchlight has cooled down.
3. Read
chapter
2.2
How to handle metal halide lamps
.
4.
Make sure that the metal halide lamps do not get damaged during handling.
7.2 Assembly
overview
The following illustrations should help you to better understand the design of the
searchlight, before starting with the replacement work. Follow the instructions on the
following pages for carrying out the replacement work!
1
3
2
1 Casing
2 Front
glass
3 Quick
release
clamp
Содержание SKS 575
Страница 1: ...OPERATING INSTRUCTIONS SUEZ CANAL SEARCHLIGHT SKS 575 230 V 50 60 Hz ...
Страница 11: ...50100935001_SKS 575 Ver2 Rev 02112012E An overview of the unit 11 Circuit diagram ...
Страница 21: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 21 10 Type Approval ...
Страница 22: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 22 ...
Страница 23: ...50100935001_SKS 575 Ver2 Rev 02112012E Type Approval 23 ...