9
FR-1370L
、
FR-1370LD
、
FR-1370L/T
FR-1370AL/L
Diagram 9
1. Prepare the machine for use
1
)
This machine is equipped with three crust grounded socket, please check if it is well
connected so as to ensure safe operation.
2
)
First-time use or too long intermission will moisten the electronic heating elements, so
several minutes’ low-temperature preheating is necessary before the normal operation.
3
)
Adjust the conveyor table’s height and horizontal location to get required sealing position.
4
)
According to the external size from sealing line to bag opening, regulate the position of
feed opening.
5
)
According to the thickness of material that to be sealed, adjust the clearance between
both heating and cooling blocks to be the thickness of thickness of packing bag in one
layer, which must guarantee the firmness of sealing and high definition of embossing, and
ensure suitable length extended from two ends of sealing part.
6
)
The transverse adjustment for horizontal machine’s conveyor table, loosen two screws (1)
at the bottom of the conveyor table. Move out the conveyor table to the suitable position,
then fasten the screws.(see diagram 10)
Содержание FRM-1120L
Страница 7: ...6 Diagram 4 FR 1370LD Continuous band sealer with two sets of heating blocks Diagram 5 ...
Страница 16: ...15 VIII Breakdown Drawing of Machine Body FRM 1120L Diagram16 ...
Страница 19: ...18 FRM 1120L Diagram 17 ...
Страница 21: ...20 IX Breakdown Drawing of Conveyor FRS 1120W Diagram18 ...
Страница 23: ...22 X Breakdown Drawing of Rack FRS 1120W Diagram 19 ...
Страница 25: ...24 FRM 1120L Diagram 20 ...