45
Inspection and Start-up Checklists
Receiving and Inspecting
Unit received undamaged
Unit received complete as ordered including accessories
Handling and Installing
Unit mounted on solid level surface
Sufficient space allowed for access to unit and accessories.
Proper electrical service
provided
Hot water provided to humidifier
Drain lines and trap installed properly
Ductwork, fittings and grilles installed properly
All cold duct surfaces insulated
Low ambient control included if freezing condition present.
No obstructions to air
flow to condenser
Starting-up the Unit
General visual inspection looks good.
All wiring connections checked
All ducts, grilles and panels in place
Start unit
Check ducts and connections for air leaks
Balance air distribution
Confirm condenser airflow is unrestricted
Verify cooling and heating operation
Check for excessive noise or vibration
Содержание D0200
Страница 12: ...12 Overview Illustration of the Wine Guardian Unit Fig 1 Fig 2...
Страница 13: ...13 Overview Illustration of water cooled system Fig 3 Fig 4...
Страница 14: ...14 Wiring diagrams D025 and D050 Fig 5...
Страница 15: ...15 Wiring diagram D088 and D200 Fig 6...
Страница 16: ...16 Wiring diagram water cooled D025 and D050 Fig 7...
Страница 17: ...17 Wiring diagram water cooled D088 and D200 Fig 8...