2
OPM-132/D
TABLE OF CONTENTS
SAVE THESE INSTRUCTIONS
2
SPECIFICATIONS 3
GENERATOR
ENGINE
TESTING POLICY
3
SAFETY INFORMATION
4
CALIFORNIA PROPOSITION 65
ANSI SAFETY DEFINITIONS
INTRODUCTION 5
INTENDED USES
RESTRICTED USES
UNIT CAPABILITIES
5
GENERATOR CONNECTIONS
STARTING ELECTRIC MOTORS
PREPARING THE UNIT
6
UNPACKING
LUBRICATION
OIL RECOMMENDATIONS
OIL ALERT SYSTEM
GASOLINE
AUTOMATIC VOLTAGE REGULATOR
BATTERY INSTALLATION
BATTERY CHARGING
LIFTING EYE INSTALLATION
OPTIONAL DOLLY KIT
INITIAL START UP
8
BASIC OPERATION
STARTING HINTS
CONNECTING THE LOADS
9
APPLYING THE LOADS
GROUNDING
WIRING
YOURGEN
10
ENGINE CARE
12
MAINTENANCE SCHEDULE
CHECKING THE OIL LEVEL
CHANGING THE OIL
DUAL ELEMENT AIR FILTER
SPARK PLUG
CARBON CANISTER
GENERATOR CARE
14
EXERCISING THE GENERATOR
GENERATOR MAINTENANCE
CLEANING
TROUBLESHOOTING 14
RECEPTACLE WIRING DIAGRAM
15
36 MONTH LIMITED WARRANTY
16
CA EMISSION CONTROL WARRANTY 16
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should
be followed during installation and maintenance of the
generator. Read and understand all instructions in the
manual before starting and operating the generator.
USING THIS MANUAL
Congratulations on your choice of a WINCO generator.
You have selected a high-quality, precision-engineered
generator designed and tested to give you years of
satisfactory service.
To get the best performance from your new generator, it is
important that you carefully read and follow the operating
instructions in this manual.
Should you experience a problem please follow the
“Troubleshooting Tables” near the end of this manual.
The warranty listed in the manual describes what you can
expect from WINCO should you need service assistance in
the future.