background image

6

OPM-137/D

PREPARING THE UNIT

UNPACKING

CAUTION: EQUIPMENT DAMAGE

When you unpack your new generator, be sure to remove 
all of the information sheets and manual from the carton.

1. As you receive your unit, it is critical to check it for any 
  damage. If any damage is noted, it is always easiest to 
  refuse the shipment and let WINCO take care of the 
  freight claim. If you sign for the unit, the transfer of the 
  ownership requires that you file the freight claim

2. Before proceeding with the preparations of your new 
  generator for operation, take a couple of minutes to 
  ensure the unit you have received is the correct model 
  and review the specification pages in this manual to 
  ensure that this unit meets your job requirements.

Содержание 50PTOC4-03/1

Страница 1: ...uld ever need to contact us concerning this unit it will help us to respond to your needs faster MODEL __________________________________________________ SERIAL NUMBER ________________________________...

Страница 2: ...THREE PHASE 277 480V THREE PHASE 36 MONTH LIMITED WARRANTY 20 LIMITED WARRANTY 20 SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during installation and ma...

Страница 3: ...unit is properly grounded for your application WARNING FIRE HAZARD Gasoline and other fuels present a hazard of possible explosion and or fire A Do not refuel when the engine is running or hot B Keep...

Страница 4: ...RPM AVR AS440 Input Shaft 1 3 8 6 spline Required Tractor PTO HP100 Gear Lube Volume 0 875 Pint Type SAE 80 90W 140 50PTOC4 17 1 Watts 50 000 Volts 120 240 Phase Three Amps 120 Input Speed 540 RPM Gen...

Страница 5: ...han required for full power operation The generator will work but produce only as much kW output as the tractor can supply HP for For example a 20 HP output tractor will deliver a maximum of approxima...

Страница 6: ...is noted it is always easiest to refuse the shipment and let WINCO take care of the freight claim If you sign for the unit the transfer of the ownership requires that you file the freight claim 2 Bef...

Страница 7: ...g on flat level ground All four deck pads must be in constant contact with the ground at all times This will reduce the vibration in both the generator and the tumbling bar C For safety the generator...

Страница 8: ...the following diagrams A properly rated and installed double throw manual power isolation transfer switch must be used with a standby generator The transfer switch isolates the load from the power li...

Страница 9: ...k 7 8 of an inch and inserted into one of the contacts in the plug kit You will then either need to solder them together using a good grade of resin core solder or they can be crimped with an appropri...

Страница 10: ...TS WITH EMERGENCY POWER IMPORTANT When making standby service hook up make sure load to be transferred to standby generator will not exceed generator rating Watthour Meter Watthour Meter To Power Line...

Страница 11: ...e load disconnect receptacle is the largest gray receptacle on the generator output panel To aid in determining how much load can be applied to the generator and how it should be distributed among the...

Страница 12: ...he gearcase marked OIL LEVEL To refill oil see LUBRICATION in the MAINTENANCE section in this manual NOTE Either too little or too much oil can harm the equipment 3 Make sure the drive shaft tumbling...

Страница 13: ...t should be checked each time you use the generator As a quick check you can plug in a trouble light and check for normal brightness 4 With engine and generator running smoothly switch on the electric...

Страница 14: ...east once every twelve months or 150 hours of operation Change it more often if you use the generator in bad weather Use the following procedure to change generator gearcase oil 1 Remove gearcase brea...

Страница 15: ...breather CLEANING INSPECTION Use a vacuum cleaner or dry low pressure compressed air regulated at 25 35 PSI to clean the generator periodically WARNING Do NOT clean the generator while it is running P...

Страница 16: ...R 7 Shorted or open rotor 8 Shorted or open stator 1 Reset circuit breakers replace if defective 2 Disconnect the load Check voltage at receptacle cord set Check motors appliances and load leads for s...

Страница 17: ...17 OPM 137 D WIRING DIAGRAM G1 G1 G2 G2 GND GND GND GND GND G2 G2 G2 G2 G1 G1 G1 N N N 120 240V SINGLE PHASE BACK VIEW...

Страница 18: ...18 OPM 137 D N GND GND GND GND GND N N G3 G3 G2 G3 G2 G2 G2 G2 G1 G1 G1 G1 G1 120 208V 120 240V THREE PHASE BACK VIEW...

Страница 19: ...19 OPM 137 D GND GND GND N N N N G3 G3 G2 G2 G1 G1 G1 G1 G1 277 480V THREE PHASE BACK VIEW...

Страница 20: ...you may have other rights which vary from state to state Note Some states do not allow limitation on the duration of implied warranty and some states do not allow the exclusion or limitation of incid...

Отзывы: