6 Description  and  function

6.1 Description of the unit 

The DrainLift XL sewage lifting unit (Fig. 1) is a connection-ready, fully submersible sewage 
lifting unit (flooding height: 2 mwc, flooding time: 7 days) with a gas and watertight col-
lection tank and buoyancy safeguards. 
The integrated centrifugal pumps are equipped with clogging-free vortex impellers. The 
level sensor (Fig. 1, no. 5) registers the level in the tank and sends this value to the switch-
gear, which switches the pumps on or off automatically. Refer to the operating instructions 
of the switchgear for a detailed description of the functions. 

6.2 Function

The discharged sewage is collected in the collection tank of the lifting unit. The inlet is 
from a sewage inlet pipe which can be connected as required to the horizontal surface 
(rear of the tank).
The DrainLift XL sewage lifting unit is delivered with switchgear and pre-installed CEE plug 
with phase inverter, breakdown barrier and level sensor supplied in the same package. The 
water level in the tank is registered by means of the integrated level sensor. If the water 
level rises as far as the set activation point then one of the pumps mounted on the tank is 
switched on and the collected sewage is automatically pumped into the connected exter-
nal sewage line. If the water level continues to rise, the second pump is activated. When 
the high water level is reached, an optical and audible signal is issued, the alarm signal con-
tact is actuated and there is additionally a forced switch-on of the pump(s). In order for 
both pumps to be loaded evenly, pump cycling occurs after each pump cycle. If one of the 
pumps fails, the other pump takes over the entire pumping work. 
The pump(s) are deactivated once the deactivation level is reached. To avoid sudden valve 
closures, a follow-up time can be set in the switchgear in order for the base-load pump to 
be operated up to slurping operation. The follow-up time is understood to be the time that 
elapses after the level drops below the deactivation point until the base-load pump 
switches off. 
A dual non-return valve is built into the unit so that a non-return valve required in acc. with 
EN 12056 no longer has to be installed in the pressure pipeline. The pressure channels of 
both pumps are joined in the non-return valve. A venting mechanism allows the pressure 
pipe to be drained into the tank, if necessary.

Fig. 1: Description of the unit

1

Pump

2

Non-return valve

3

Inlet DN 150

4

Buoyancy safeguards

5

Level sensor

6

Ventilation connection piece DN 70

7

Maintenance aperture

1

1

2

4

3

7

5

6

Содержание DrainLift XL

Страница 1: ...edieningsvoorschriften E Instrucciones de instalaci n y funcionamiento I Istruzioni di montaggio uso e manutenzione GR TR Montaj ve kullanma k lavuzu H Be p t si s zemeltet si utas t s PL Instrukcja m...

Страница 2: ...Fig 10...

Страница 3: ...Fig 11...

Страница 4: ...etechnicianandthe responsible specialist operator before installation and commissioning It is not only the general safety instructions listed under the main point safety that must be adhered to but al...

Страница 5: ...ilst the product is in operation Leakages e g from the shaft seals of hazardous fluids which are explosive toxic or hot must be led away so that no danger to persons or to the environment arises Natio...

Страница 6: ...s such as heavy metals biocides pesticides acids bases salts cleaning agents and disinfectants dish washing or laundry detergents and such which have a high degree of foam formation or swimming pool w...

Страница 7: ...ons Any use going over and beyond the intended use is considered to be improper 5 Product information 5 1 Type key Example DrainLift XL 2 25 3 DrainLift Sewage lifting unit XL Size 2 2 double pump sys...

Страница 8: ...detailed list and description see the cata logue price list The following accessories are available Flange piece DN 80 DN 80 100 1 pc DN 80 100 already included in scope of delivery DN 100 DN 150 for...

Страница 9: ...the tank is switched on and the collected sewage is automatically pumped into the connected exter nal sewage line If the water level continues to rise the second pump is activated When the high water...

Страница 10: ...Make sure the installation location is ventilated sufficiently 7 1 Preparing for installation CAUTION Risk of property damage Incorrect installation can result in damage to the product Only use qualif...

Страница 11: ...not be subjected to any pipeline forces or torques The pipes including valves are to be fastened and supported in such a manner that neither tensile nor compressive forces are applied to the unit All...

Страница 12: ...surge like water entry and strong air entry are avoided as much as possible It is possible to connect the inlet pipe into the vertical surface above the horizontal con nection surface Leave out the a...

Страница 13: ...ightness of the pipe connection depends on this decisively Fig 6 Setting up the inlet port DN 150 DN 100 1 1 Define the position of the middle of the inlet and mark it Cut the hole using the keyhole s...

Страница 14: ...Secure the venting pipe against slipping out using clamps and always install with a downward incline toward the unit 7 3 4 Emergency drain connection diaphragm hand pump It is always recommended to i...

Страница 15: ...5 A slow DrainLift XL 2 15 25 A slow DrainLift XL 2 20 25 A slow DrainLift XL 2 25 25 A slow NOTE To increase the operational reliability it is mandatory for an automatic circuit breaker which disconn...

Страница 16: ...arrier and the switchgear and tighten the housing screws DANGER Danger of explosion If a level sensor is used in potentially explosive areas there is a danger of explosion Always use a breakdown barri...

Страница 17: ...e pressure pipeline is completely filled The filling level in the tank must not rise when the discharge piping is filled and the inlet closed If the filling level continues to rise the flap of the non...

Страница 18: ...owing points in particularin case of deviations from the recommended settings The filling level probe must be in contact with the base of the tank According to EN 12056 4 the switching volume should b...

Страница 19: ...ime of the pumps 8 3 Decommissioning The unit must be decommissioned prior to maintenance or dismantling work WARNING Risk of burns Depending on the operating status of the system the entire pump can...

Страница 20: ...subjected to maintenance by experts in accordance with EN 12056 4 The intervals must not exceed year in the case of commercial companies year for units in multi family houses 1 year for units in singl...

Страница 21: ...eposits in the pump and or tank 2 Incorrect direction of rotation Swap two phases of the current feed 3 Wear to inner parts impeller bearing Replace worn parts 4 Operating voltage too low 5 Running on...

Страница 22: ...ion de la directive basse tension 2006 95 CE sont respect es conform ment appendice I no 1 5 1 de la directive CE relatives aux machines 2006 42 CE Elektromagnetische Vertr glichkeit Richtlinie 2004 1...

Страница 23: ...nast puj cymi dokumentami Sm rnice ES pro strojn za zen 2006 42 ES dyrektyw maszynow WE 2006 42 WE EC 2006 42 EG C le t kaj c se bezpe nosti stanoven ve sm rnici o elektrick ch za zen ch n zk ho nap...

Страница 24: ...Mather and Platt Pumps Ltd Pune 411019 T 91 20 27442100 service pun matherplatt co in Indonesia WILO Pumps Indonesia Jakarta Selatan 12140 T 62 21 7247676 citrawilo cbn net id Ireland WILO Engineering...

Страница 25: ...henstra e 100 44263 Dortmund T 0231 4102 7900 T 01805 W I L O K D 9 4 5 6 5 3 F 0231 4102 7126 kundendienst wilo com T glich 7 18 Uhr erreichbar 24 Stunden Technische Notfallunterst tzung Kundendienst...

Отзывы: