background image

 

11 

Fireplace Opening 

 

IMPORTANT  NOTE:       

This appliance 

DOES  NOT 

seal onto a marble or stone back panel. The fire is installed directly into the 

FIXING PLATE assembly. Installa"on of this fixing plate is detailed on the preceding pages 5,6 & 7. 

 

The mantel should be constructed to the requirements shown on the preceding pages 8,9 & 10. 

 

The fireplace opening should be checked to ensure it meets the dimensional specifica"ons stated in the diagrams above. It 
is also important that the area surrounding the fireplace opening is flat and ver"cal. If the surface surrounding the fireplace 
opening is not flat and ver"cal then the wall should be remedied prior to the installa"on taking place.  
The FIXING PLATE (or precast spacer—if applicable) will fit against this fireplace opening, see pages 5, 6 & 7 for installa"on 
op"ons. If the fireplace opening is outside these dimensions then the opening should be made good to these dimensions 
using a suitable non-combus"ble material before proceeding. 
A  flat  surface  of  a  minimum  940mm  wide  and  700mm  high  must  be  provided  around  the  fireplace  opening  to  ensure  a 
good seal is formed between the FIXING PLATE / PRECAST SPACER and the wall. In addi"on it is important to ensure that 
the base of the fireplace opening is flat and level with the hearth surface to ensure a secure and aligned installa"on of the 
appliance. 

 

The minimum hearth dimensions are shown in the diagrams on pages 8 and 9. The upper surface of the hearth must be a 
minimum of 50mm above the floor and the fireplace opening should be filled with a suitable non combus"ble material to 
bring it level with the hearth.  

 

Installaon into a Brick Chimney 

When  the  appliance  is  being  installed  into  a  brick  chimney  there  must  be  sufficient  depth  behind  the  appliance  to 
accommodate  any  falling  debris.  This  debris  collec"on  void  should  be  capable  of  accommoda"ng  twelve  (16.5)  litres  of 
volumetric space. The flue height must be a minimum of 3 metres. 

 

Installaon into a Prefabricated Twin Wall  Metal Flue Box 

This appliance can be installed into a prefabricated metal twin wall flue box providing it complies to  the requirements of 
BS715  /  BS  EN  1856-2.  The  box  must  have  an  insulated  flue  with  a  minimum  diameter  of  125mm  (5”)  diameter  and  a 
minimum effec"ve overall height of 3 metres. 

 

The top outer face of the flue box should be insulated to prevent heat loss with a layer of mineral wool insula"on or similar. 
The metal flue box (to BS715) must stand on a non-combus"ble surface with a minimum thickness of 12mm. 

 

Installaon into a PRE-CAST FLUE Installaon 

Ensure that there is a minimum of 115mm from the front of the fireplace opening to the rear of the flue starter block—this 
is to ensure that sufficient clearance is allowed for debris collec"on. The flue height must be a minimum of 3 metres. 

SITING THE APPLIANCE 

Содержание HE950L

Страница 1: ...is able to fully operate the appliance and is aware of any cleaning or maintenance requirements HE950L GAS FIRE Model number F 091XX2 for use on Natural Gas G20 at a supply pressure of 20 mbar in GB...

Страница 2: ...nstalla ons 13 Installa on of Fixing Plate Standard Installa ons 14 Installing the Mantel 15 Installing the Appliance 16 Connec ng the Appliance to the Gas Supply 16 Glass Panel Front Trim Installa on...

Страница 3: ...to this appliance and must have no openings to any other room The opening should be inspected and any exposed brickwork should be repaired where necessary The chair brick if applicable should be remov...

Страница 4: ...stalla on then no hearth is technically required however the installer should make the customer aware of the recommenda ons detailed on page 16 Do not place so wall coverings i e embossed papers etc f...

Страница 5: ...ermore a suitable high temperature mas c should be used to further seal around the outside edge of the 950L FIXING PLATE and the wall The TYPE A INSTALLATION is completed by installing the 950L STANDA...

Страница 6: ...e chimney breast should be the same as the spacer thickness i e 55mm For minimum hearth requirements see page 8 The 950L FIXING PLATE is then screwed to the 950L PRECAST SPACER using the screws provid...

Страница 7: ...edge of the 950L FIXING PLATE and the wall See further details on page 13 Ensure the hearth is set level before con2nuing with the installa2on Failure to install a level hearth could a ect the install...

Страница 8: ...installa on for BOTH 950L STANDARD 950L PRECAST MANTELS is detailed separately on page 10 DESCRIPTION mm min mm max A Width of Opening 802mm 804mm B Height of Opening 624mm 627mm C Height of Hearth 50...

Страница 9: ...nstalla on for BOTH 950L STANDARD 950L PRECAST MANTELS is detailed separately on page 10 DESCRIPTION mm min mm max A Width of Opening 802mm 804mm B Height of Opening 624mm 627mm C Height of Hearth 50m...

Страница 10: ...ontrols area of the appliance and provides access for ba ery changes or service The installer should check that the Access Cover has been made to the correct dimensions and then ensure the rear face i...

Страница 11: ...and aligned installa on of the appliance The minimum hearth dimensions are shown in the diagrams on pages 8 and 9 The upper surface of the hearth must be a minimum of 50mm above the oor and the repla...

Страница 12: ...S FIXING PLATE IS INSTALLED BEFORE THE MANTEL AND FIRE ARE FITTED When the hearth has been installed and the replace opening is prepared as per the details on page 11 of these instruc ons the PRECAST...

Страница 13: ...ECAST INSTALLATIONS ONLY For Class 1 and Class 2 installa ons see page 14 PRECAST INSTALLATIONS Once screwed into posi on ensure this FIXING PLATE is sealed air ght against the PRECAST SPACER with a s...

Страница 14: ...ce opening and hearth Use the 8 screws and plugs supplied in the appliance installa on kit Once screwed into posi on ensure this FIXING PLATE is sealed air ght against the wall with a suitable heatpro...

Страница 15: ...tended for installa on into a marble or stone mantel constructed of non combus ble material For this reason no clearances from combus ble shelf are given INSTALLING THE MANTEL ALL INSTALLATIONS Instal...

Страница 16: ...ay using the 2 two screws provided Carefully slide the rebox into the opening Note the rubber seal is pre ed to the appliance on the sealing face THIS APPLIANCE CAN BE INSTALLED AS A HOLE IN THE WALL...

Страница 17: ...n top of the marble access cover ensuring the control lever pokes through the lower slot in the trim Now rotate into posi on The front face of the trim should be in line with the front of the mantel a...

Страница 18: ...the centre slot at the top of the appliance Once fully in the holder should be rotated 90 degrees Now move the match holder to the le0 side of the slot AS FAR AS POSSIBLE This will posi on the smoke...

Страница 19: ...rch used in the manufacturing of the ceramic fuel bed paints curing and oils remaining on some metal components that will burn o This odour is non toxic and will eventually disappear a0er a few hours...

Страница 20: ...ove any dust or deposits If you intend to use a vacuum cleaner then this should only be done once the loose volcanic rock and any loose deposits of soot etc have been removed Ensure that the moulded c...

Страница 21: ...liance is cold Remove the glass panel as described on page 17 Remove the fuel e ect components put in a suitable loca on where they cannot be damaged Disconnect the gas supply from the restrictor elbo...

Страница 22: ...e HT lead from the electronic igniter unit 4 Remove the two 2 screws securing the pilot to the burner tray 5 Remove the two 2 screws securing the microswitch to the tray 6 The pilot assembly can be re...

Страница 23: ...trol lever to the right to the ame symbol A stop will be felt at this posi on 5 It is also possible to adjust the control knob between the and the ame symbols to achieve mid seDngs 6 To turn the re o...

Страница 24: ...he customer as required and the frequency will be depend upon use See page 17 for glass panel removal and installa on Step 2 Fit log B onto the loca on bracket in the centre of the burner tray as show...

Страница 25: ...25 Step 4 Fit front rail LH and RH sec ons onto the front support as shown in the picture below Step 5 Fit Central Log C onto the fuel bed as shown in the picture below...

Страница 26: ...26 Step 6 Fit Y shaped log D onto the fuel bed as shown in the picture below Step 7 Fit Y shaped Log E onto the fuel bed as shown in the picture below...

Страница 27: ...8 Fit Log F onto the fuel bed as shown in the picture below Step 9 Fit Log G onto the fuel bed as shown in the picture below Now re t the glass panel front trim and marble access cover see page 17 for...

Страница 28: ...Gas Safe Registered Installer Full details are provided in this manual Hearth Products Ltd Unit 14 Tollgate Industrial Estate Sta ord ST16 3SU Product Fiche Manufacturer Hearth Products Ltd Model No F...

Страница 29: ...201H Pack of volcanic rock P XX13990 Glass Panel with frame assembly P XX13990B Front Black Trim Assembly Due to our policy of con nual product improvement some diagrams and small details may not be a...

Отзывы: