10 

MARBLE ACCESS COVER 

CRITICAL DIMENSIONS 

This Access Cover MUST be constructed from Non-Combusble Materials. 

These diagrams detail the CRITICAL dimensions of the MARBLE/STONE ACCESS COVER 

This informa"on is to be used for both

 950L STANDARD 

950L PRECAST 

MANTELS 

 

DESCRIPTION 

mm

 (min) 

mm

 (max) 

Marble Access Cover Width 

799mm 

801mm 

Marble Access Cover Height 

98mm 

100mm 

Chamfer Detail 

6mm 

N/A 

A Marble/Stone Access Cover is required to sit below the front trim plate. This Access Cover  is used to conceal 
the controls area of the appliance and provides access for ba?ery changes or service.  
The installer should check that the Access Cover has been made to the correct dimensions and then ensure the 
rear face is dry and clean, mark a ver"cal centre line with a pencil. 
Using the two pieces of double sided bonding tape supplied, affix the support plate to the rear face of the Access 
Cover. 
Ensure  that  the  support  plate  and  the  Access  Cover  are  flush  at  the  base  and  that  the  two  arrow  marks  are 
aligned in the centre of the marble cover (see fig 3 below).  
The marble/stone access cover sits on the hearth in front of the appliance. 

Use the two adjustable magnets on the appliance to align the front edge of the marble with the mantel. 

 

Содержание HE950L

Страница 1: ...is able to fully operate the appliance and is aware of any cleaning or maintenance requirements HE950L GAS FIRE Model number F 091XX2 for use on Natural Gas G20 at a supply pressure of 20 mbar in GB...

Страница 2: ...nstalla ons 13 Installa on of Fixing Plate Standard Installa ons 14 Installing the Mantel 15 Installing the Appliance 16 Connec ng the Appliance to the Gas Supply 16 Glass Panel Front Trim Installa on...

Страница 3: ...to this appliance and must have no openings to any other room The opening should be inspected and any exposed brickwork should be repaired where necessary The chair brick if applicable should be remov...

Страница 4: ...stalla on then no hearth is technically required however the installer should make the customer aware of the recommenda ons detailed on page 16 Do not place so wall coverings i e embossed papers etc f...

Страница 5: ...ermore a suitable high temperature mas c should be used to further seal around the outside edge of the 950L FIXING PLATE and the wall The TYPE A INSTALLATION is completed by installing the 950L STANDA...

Страница 6: ...e chimney breast should be the same as the spacer thickness i e 55mm For minimum hearth requirements see page 8 The 950L FIXING PLATE is then screwed to the 950L PRECAST SPACER using the screws provid...

Страница 7: ...edge of the 950L FIXING PLATE and the wall See further details on page 13 Ensure the hearth is set level before con2nuing with the installa2on Failure to install a level hearth could a ect the install...

Страница 8: ...installa on for BOTH 950L STANDARD 950L PRECAST MANTELS is detailed separately on page 10 DESCRIPTION mm min mm max A Width of Opening 802mm 804mm B Height of Opening 624mm 627mm C Height of Hearth 50...

Страница 9: ...nstalla on for BOTH 950L STANDARD 950L PRECAST MANTELS is detailed separately on page 10 DESCRIPTION mm min mm max A Width of Opening 802mm 804mm B Height of Opening 624mm 627mm C Height of Hearth 50m...

Страница 10: ...ontrols area of the appliance and provides access for ba ery changes or service The installer should check that the Access Cover has been made to the correct dimensions and then ensure the rear face i...

Страница 11: ...and aligned installa on of the appliance The minimum hearth dimensions are shown in the diagrams on pages 8 and 9 The upper surface of the hearth must be a minimum of 50mm above the oor and the repla...

Страница 12: ...S FIXING PLATE IS INSTALLED BEFORE THE MANTEL AND FIRE ARE FITTED When the hearth has been installed and the replace opening is prepared as per the details on page 11 of these instruc ons the PRECAST...

Страница 13: ...ECAST INSTALLATIONS ONLY For Class 1 and Class 2 installa ons see page 14 PRECAST INSTALLATIONS Once screwed into posi on ensure this FIXING PLATE is sealed air ght against the PRECAST SPACER with a s...

Страница 14: ...ce opening and hearth Use the 8 screws and plugs supplied in the appliance installa on kit Once screwed into posi on ensure this FIXING PLATE is sealed air ght against the wall with a suitable heatpro...

Страница 15: ...tended for installa on into a marble or stone mantel constructed of non combus ble material For this reason no clearances from combus ble shelf are given INSTALLING THE MANTEL ALL INSTALLATIONS Instal...

Страница 16: ...ay using the 2 two screws provided Carefully slide the rebox into the opening Note the rubber seal is pre ed to the appliance on the sealing face THIS APPLIANCE CAN BE INSTALLED AS A HOLE IN THE WALL...

Страница 17: ...n top of the marble access cover ensuring the control lever pokes through the lower slot in the trim Now rotate into posi on The front face of the trim should be in line with the front of the mantel a...

Страница 18: ...the centre slot at the top of the appliance Once fully in the holder should be rotated 90 degrees Now move the match holder to the le0 side of the slot AS FAR AS POSSIBLE This will posi on the smoke...

Страница 19: ...rch used in the manufacturing of the ceramic fuel bed paints curing and oils remaining on some metal components that will burn o This odour is non toxic and will eventually disappear a0er a few hours...

Страница 20: ...ove any dust or deposits If you intend to use a vacuum cleaner then this should only be done once the loose volcanic rock and any loose deposits of soot etc have been removed Ensure that the moulded c...

Страница 21: ...liance is cold Remove the glass panel as described on page 17 Remove the fuel e ect components put in a suitable loca on where they cannot be damaged Disconnect the gas supply from the restrictor elbo...

Страница 22: ...e HT lead from the electronic igniter unit 4 Remove the two 2 screws securing the pilot to the burner tray 5 Remove the two 2 screws securing the microswitch to the tray 6 The pilot assembly can be re...

Страница 23: ...trol lever to the right to the ame symbol A stop will be felt at this posi on 5 It is also possible to adjust the control knob between the and the ame symbols to achieve mid seDngs 6 To turn the re o...

Страница 24: ...he customer as required and the frequency will be depend upon use See page 17 for glass panel removal and installa on Step 2 Fit log B onto the loca on bracket in the centre of the burner tray as show...

Страница 25: ...25 Step 4 Fit front rail LH and RH sec ons onto the front support as shown in the picture below Step 5 Fit Central Log C onto the fuel bed as shown in the picture below...

Страница 26: ...26 Step 6 Fit Y shaped log D onto the fuel bed as shown in the picture below Step 7 Fit Y shaped Log E onto the fuel bed as shown in the picture below...

Страница 27: ...8 Fit Log F onto the fuel bed as shown in the picture below Step 9 Fit Log G onto the fuel bed as shown in the picture below Now re t the glass panel front trim and marble access cover see page 17 for...

Страница 28: ...Gas Safe Registered Installer Full details are provided in this manual Hearth Products Ltd Unit 14 Tollgate Industrial Estate Sta ord ST16 3SU Product Fiche Manufacturer Hearth Products Ltd Model No F...

Страница 29: ...201H Pack of volcanic rock P XX13990 Glass Panel with frame assembly P XX13990B Front Black Trim Assembly Due to our policy of con nual product improvement some diagrams and small details may not be a...

Отзывы: