![Wilden Turbo-Flo T8 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/wilden/turbo-flo-t8/turbo-flo-t8_engineering-operation-and-maintenance_980906022.webp)
WIL-10272-E-01
Wilden
®
22
Gasket Kit / Installation
The Wilden T8 cast iron pumps require PTFE gasket tape on the liquid
chambers (P/N 04-9502-99). Other pump types may use PTFE gasket
kits for additional sealing characteristics. During reassembly follow the
procedures listed in your pump’s
Engineering, Operation and
Maintenance manual.
Carefully prepare sealing surfaces by removing all debris and foreign
matter from diaphragm bead and all mating surfaces If necessary,
smooth or deburr all sealing surfaces. Mating surfaces must be properly
aligned in order to ensure positive sealing characteristics.
Always wear safety glasses when performing maintenance on any
Wilden product.
Step 1
Gently remove the adhesive covering from the back of the PTFE
tape. Ensure that the adhesive strip remains attached to the PTFE
tape.
Step 2
Starting at any point, place the PTFE tape in the center of the
diaphragm bead groove on the liquid chamber and press lightly on
the tape to ensure that the adhesive holds in place during assembly.
Do not stretch the tape during placement in the center of
diaphragm bead groove.
Step 3
The end of the tape should overlap approximately
13 mm (1/2"). Proceed to install the PTFE tape on the
remaining diaphragm.
Содержание Turbo-Flo T8
Страница 1: ...EOM ENGINEERING OPERATION MAINTENANCE T8 Clamped Metal Pump WIL 10272 E 01 Where InnovationFlows...
Страница 23: ...WIL 10272 E 01 Wilden 23 EXPLODED VIEW AND PARTS LISTING T8 METAL Rubber TPE Fitted EXPLODED VIEW Section 9...
Страница 25: ...WIL 10272 E 01 Wilden 25 T8 METAL Rubber TPE Fitted EXPLODED VIEW...
Страница 27: ...WIL 10272 E 01 Wilden 27 T8 METAL PTFE Fitted EXPLODED VIEW...
Страница 30: ...WIL 10272 E 01 Wilden Notes...
Страница 31: ...WIL 10272 E 01 Wilden Notes...