background image

© Wikora GmbH 

Page 14  

                      Status: 27.04.2015 

 

                                                                                                                                                                       Errors excepted.        

 

7 General operation and maintenance instruction 

 
Present operation and maintenance instruction and the compliance with it in combination with the installation and maintenance 
record is part of the guarantee and warranty! 
 

Operation 

 

Your Wikora solar heating system is preset according to the present installation and maintenance record. In general, 
there is no need of changing the preset parameters.  

 

Please do not change the preset parameters by yourself. You will lose any warranty and guarantee claim. 

 

If you do not conform to the preset parameters, please let them change and document by a specialist.  

 

The various system parameters can be accessed according to enclosed instruction manual of the controller.  

 

It  is  recommended  to  vent  the  solar  heating  system  approx.  4  weeks  after  the  initial  operation.  This  should  be 
undertaken by a specialist. If you wish to vent the system by yourself, you can do it one-time at the central vent of the 
solar pump group. 

 

Venting procedure 

 

Please switch off your solar heating system in the evening.  

 

Open  the  air  valve  at  the  central  vent  by  using  a  radiator  vent  key.  Once  liquid  pours  out,  close  this  air  valve.  The 
procedure is terminated.  

 

Switch on again your solar heating system. 

 

Please never vent at sunshine or running pump!  

 

Please  do  not  undertake  an  additional  venting  process.  If  the  system’s  working  pressure  drops  later  on  or  if  the 
system does not give any heat, please call a specialist.  

 

Maintenance of solar heating system 

 

Your Wikora solar heating system is a closed heating system. It corresponds to the safety regulations of DIN 4751, 
DIN 702 and DIN 721. 

 

Such systems have to be built and maintained exclusively by qualified and specialized companies.  

 

Please do not refill water in case of pressure loss but call a specialist for assistance.  

 

Only a solar concentrate released by Wikora may be refilled. 

 

The valid system working pressure is shown in the installation and maintenance record and corresponds to 3.0 bar, in 
general. 

 

Please do never remove the drain bottle under the exhaust line of the safety valve which is to collect the blast solar 
liquid in case of over pressure. 

 

The solar heating system and the condition of the solar concentrate are to be checked and documented annually by a 
specialist.  Otherwise, any guarantee and warranty claim expires. 

 

 

7.1 Evidence of maintenance

 

 

 

Date 

Name / Company 

Executed activity 

Kg refilled sole 

Color medium 

 

 

 
 
 
 

 

 

 uncolored 

 brown 

 black 

 cloudy 

 

 

 
 
 
 

 

 

 uncolored 

 brown 

 black 

 cloudy 

 

 

 
 
 
 

 

 

 uncolored 

 brown 

 black 

 cloudy 

 

 

 
 
 
 

 

 

 uncolored 

 brown 

 black 

 cloudy 

 

 

 
 
 
 

 

 uncolored 

 brown 

 black 

 cloudy 

 

Chart 10: Evidence of maintenance 

 

Содержание Wikosun 2010

Страница 1: ...e covered if the installation instructions are followed Warranty does not cover any damages caused by non observance of this manual The correct functioning is only guaranteed if the installation instr...

Страница 2: ...Wikosun 2010 2510 Profile rails aluminum Z clamp Collector support bracket Parallel compression fitting 18mm Compression X fitting 18x18x12 x3 4 FD incl air screw and sensor pocket Insulation on site...

Страница 3: ...6 washers ST BFS BL 2 clamps for rolled steel joist 2 screws M8 2 nuts M8 ST BFS ST 2 stair bolts M10 2 ears 6 nuts 2 seals ST BFS T 2 roof hooks profiled sheeting ST BFS W 2 roof hooks corrugated sh...

Страница 4: ...s 5 mm 1 Flat section aluminum 40x5 mm l 1710 mm s 5 mm 7 Hex head screws stainless steel M8 x 20 mm 7 Hex nuts stainless steel M8 7 Lock washers M8 Chart 4 Fastening sets flat roof mounting horizont...

Страница 5: ...with reference to DIN 1055 100 DIN 1055 4 and DIN 1055 5 Determine the values of local snow loads according to country specific data Determine the values of local wind loads according to country speci...

Страница 6: ...mensionally mediated according to the number of collectors The distances between the upper and lower profile rail are as follows see fig 4 On roof mounting vertical 1500 1600 mm WIKOSUN 2010 1800 1900...

Страница 7: ...ms Smaller rafters should be doubled or trebled in width at the point where brackets are to be fixed to them see fig 6 If a foil under the roof tiles exist and is harmed during installation the openin...

Страница 8: ...al installation 0 5m 200 kg 300 kg 5 10 m 250 kg 350 kg 10 20 m 300 kg 400 kg 20 m Calculation necessary Chart 8 Loading per collector 3 3 1 1 Installation of the mounting frame on mass elements e g c...

Страница 9: ...ulated and measured For roof angles smaller than 60 the vertical angle section must be cut 25mm above the hole Install the base of the frame the cross bars and the back bars and connect the angle sect...

Страница 10: ...Position the collectors and fix them carefully The collectors are connected with each other by using the corresponding parallel compression fittings Hand tighten the bolts and protect the connecting...

Страница 11: ...shions 3 9 Hydraulic pressure test After a successful installation rinse the entire collector circulation with water Before commissioning the collector circulation must be checked with a water pressur...

Страница 12: ...450 25 18 9 540 40 22 10 5 630 40 22 12 720 50 22 13 5 810 50 28 15 900 80 Valid for parallel collector connection In the case of series connection of the same collector arrays the flow rate is halve...

Страница 13: ...ool Absorber Material Aluminium plate on copper Aluminium plate on copper Absorber coating TINOX ENERGY Alanod Mirotherm TINOX ENERGY Alanod Mirotherm Pressure loss 50 l h 49 Pa collector 54 Pa collec...

Страница 14: ...minated Switch on again your solar heating system Please never vent at sunshine or running pump Please do not undertake an additional venting process If the system s working pressure drops later on or...

Страница 15: ...no atmospheric oxygen in the system It must be ensured that the circulating pump is suitable for operation with antifreeze agents Before being filled the system should be flushed with water and the ti...

Страница 16: ...he local authority in charge Cleaning clean with liquid binding material sand kieselguhr acid binder or universal binder Recycle contaminated material separately Keep the concentrate in a cool and dry...

Страница 17: ...hidden defects immediately after emerging In case of hidden defects it is only valid for the warranty exceeding the legal warranty period if the collectors are changed or maintained by non spezialise...

Страница 18: ...ick vent valve at collectors Primary pressure exp vessel C Type Cooling function from colour unchanged brown black cloudy Flow rate m System settings Controller setting Consumer 1 e g DHW Consumer 2 e...

Страница 19: ...ollector fastening is stable User has been instructed Maintenance contract Operation of pumps checked Temperature sensores indicate realistic values Collector interior is not fogged Collector is clean...

Отзывы: