background image

© Wikora GmbH 

Page 14  

As of November 2013 

 

 

Errors excepted. 

15  Installation record 

 

The installation has been completed according to DIN and the technical rules in force. In addition, the customer has received 
instruction concerning the operation and maintenance. 
 

 

 

 

Place………………………………………………..   

 

 

 

Date………………………………………………………… 

 
 
Customer  

 

 

                               

 

 

 

 

Installer   

 

 

 

 

 

 

 

 

 

 

 
……………………………………………………. 

 

 

 

 

………………………………………………………………. 

Signature  

 

 

 

 

                  

 

 

 

 

 Signature 

 
 
 
Place of installation: 

……………………………………………………………………………………………………………………… 

 
 
Name: 

 

 

        ……………………………………………………………………………………………………………………... 

 
 
ZIP Code/Place: 

 

…………………………………………………..…………………………………………………………………. 

 
 
Street: 

 

 

        ……………………………………………………………………...……………………………………………… 

 
 
Phone:   

 

        ……………………………………………………………………………...……………………………………... 

 
 
Tank model:   

        ……………………………….   

 

 

   Serial number …………….………………..……………… 

 
 
Date of invoice                ………………………………………………………...………………………………………………………….. 
 
 

Anode maintenance record 

 

Date 

Visual examination 

of anode 

Exchange of 

anode 

Sig stamp of installer 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
In the case of reclamation, the receipts for maintenance must be provided as proof. Please complete the data sheet, including 
the reason for reclamation, and submit to Wikora. 
 
Submitting the maintenance record does not ensure any promise of guarantee or claim.

 

 
 

Содержание GS 117 E

Страница 1: ...ber who observes the local norms and regulations The installation and maintenance record must be entirely completed and the user has to be instructed accordingly Efficient operation can only be guaran...

Страница 2: ...uit The tank is protected against corrosion by double coated enamel and magnesium anode An insulation layer between the internal tank and the steel plate housing minimizes loss of heat The steel plate...

Страница 3: ...DN 15 b Drain pipe c Water stop valve d Manometer connection nozzle e Backflow preventer f Pressure reducing valve if more than 8 bar connection pressure g Water stop valve h Test valve i Gas stop va...

Страница 4: ...min 160 205 266 Gas consumption Natural gas group E HuB 9 4 kWh m3 m3 h 0 85 0 97 1 09 Natural gas group LL HuB 8 5 kWh m3 m3 h 0 94 1 07 1 20 Liquid gas propane HuB 12 8 kWh kg kg h 0 63 0 71 0 8 No...

Страница 5: ...circulation pipe must be fitted at the tank only with an original connection attachment available as spare parts at the connection point Connect the circulation pump and reverse flow stopcock between...

Страница 6: ...d cuts off the gas supply automatically After a period of 5 minutes switch the gas boiler can be put again into operation see commissioning No 6ff Should the appliance cut off several times via the fl...

Страница 7: ...in the tank The appliance is working automatically The gas control fittings will switch off or on the main burner depending on the water temperature At the moment the appliance is switched on again th...

Страница 8: ...he measure nozzle 30 gas tight 6 Remove screw of the measure nozzle 21 and connect U tube manometer 7 Open gas stop cock and put appliance into operation according to Commissioning page 7 8 Check that...

Страница 9: ...ypes Any conversion is only to be undertaken by a registered specialist 8 1 From natural gas to liquid gas 8 1 1 Close gas stop cock and remove cover plate 15 8 1 2 Remove burner unit Loosen screws fo...

Страница 10: ...l min at nominal load Gas volume l min at nominal load kWh m Natural gas group LL 8 5 15 5 17 6 19 8 Natural gas group E 9 4 14 1 16 1 18 0 Liquid gas propane 27 7 4 8 5 4 6 1 Net heating value HUB at...

Страница 11: ...ormed of the importance of regular maintenance and that this is a decisive factor as to how long the appliance will last Openings necessary to allow air circulation around the site of installation mus...

Страница 12: ...ked I Check gas supply adjust dimensions of gas pipes clean connecting pipes clean dirt filter Ignition nozzle blocked I Clean ignition nozzle The installed ignition nozzle is too small I Install corr...

Страница 13: ...e has been modified through the installation of externally supplied parts or through irregular professional maintenance Subject to our general terms and conditions Legal warranty 2 years Guarantee yea...

Страница 14: ...aller Signature Signature Place of installation Name ZIP Code Place Street Phone Tank model Serial number Date of invoice Anode maintenance record Date Visual examination of anode Exchange of anode Si...