3
Contents
1
General
5
2
Product Transport / Storage
5
3
Main Component Definitions
6
4
Preparation of Main Components for Installation
7
5
Equipment Handling
8
6
Typical Install Process
8
7
Site Preparation
9
8
Installation Trackside Items
10
8.1 Fitting the Trackside Cabinet to Mounting Base
10
8.2 Earth Bond
10
8.3 Fitting the Cabinet mounted Solar Panel
10
8.4 Battery Charger Electrical Connection
10
8.5 Solar Systems
11
8.6 Mains Powered Systems
11
9
System Wiring Diagram
12
10
Installation of Track Items
13
10.1
Wheel Sensor
13
10.2
Blade System
14
10.3
EasiBlade Installation
14
Routing of delivery hoses, Cabinet to blade
15
10.4
Fitting the Main Delivery Hoses
15
10.5
Fill the Hoses and Blade’s
15
10.6
TOR EasiBlade Installation (Top of Rail)
16
11
Commissioning / Setting
17
11.1
Filling the Reservoir
17
11.2
Wheel Sensor Heights and Operation
17
11.3
Pump Setting
17
12
Routine Maintenance
21
12.1
Control Panel
21
12.2
Pump Setting
21
12.3
Measuring the Reservoir
22
12.4
Cabinet Maintenance
22