background image

Step 4: Base Board Riser

Gather the base board part 

No. 3, 4, 5 & 4 x 25mm nails.

Step 5: Nailing Base Board Riser

Place and nail the corners as shown in Diagram 5.

Step 6: Aligning to Base Board

Place your assembled 

Base Board 

on 

your assembled 

Base Board Risers 

as 

shown in Diagram 6.

Note: The position of the 

Base Entrance 

Riser

 in Diagram 6.

Step 7: Nailing Frame & Base

Use your 

54 x 25mm nails

 to attach base

board to 

Base Board Risers.

IMPORTANT

The 

Base Entrance Riser

 should be at 

least 2.5cm away from the front edge of the 

base board.

The 

Base Back Riser

 should sit flush with 

the back edge of the base board.

Diagram 5

Diagram 6

Diagram 7

Diagram 8

If unclear, view this manual’s cover to see 

complete assembled beehive. You will notice 

some space between the 

Entrance Riser

 & 

Base Board 

edge.

Содержание BK-HPDH20

Страница 1: ... Please read through instructions prior to constructing beehive Ensure you have all listed parts and tools required for set up before beginning A clean workplace is required for safe and easy construction of your beehive Do not use any parts that are damaged If this occurs please contact your supplier ...

Страница 2: ...Base Entrance Riser 2x Base Side Risers 1x Base Back Riser 4x Side Supers 4x Front Back Supers 1x Assembled Lid 20x Frame Top Bar 40x Frame Side Bar 20x Frame Bottom Bar 94x 25mm Nails 4x 36mm Nails 40x 40mm Nails 12x 50mm Nails 1 8 2 3 4 6 5 7 4x 4x Baseboard Assembled Lid Cleats Base Entrance Riser Base Side Riser Base Back Riser Side Supers Front Back Supers 9 10 11 20x 40x 20x Frame Top Bar Fr...

Страница 3: ... edge of your 2 x Cleats within the 14 cm pencil mark as shown in Diagram 2 14cm 14cm Diagram 1 Diagram 2 Diagram 3 Diagram 3 14cm 10cm Step 3 Nailing Cleats Use 4 x 36mm nails to attach the Cleats to the Base Board Note We suggest placing the nail 10cm in from the edge of the Cleats on each side Once done put the assembled baseboard cleats to the side Completed base board cleats should look like ...

Страница 4: ...ion of the Base Entrance Riser in Diagram 6 Step 7 Nailing Frame Base Use your 54 x 25mm nails to attach base board to Base Board Risers IMPORTANT The Base Entrance Riser should be at least 2 5cm away from the front edge of the base board The Base Back Riser should sit flush with the back edge of the base board Diagram 5 Diagram 6 Diagram 7 Diagram 8 If unclear view this manual s cover to see comp...

Страница 5: ...ether Repeat Step 8 with remaining supers Step 9 Attaching Base to Supers Turn your assembled beehive upside down as shown in Diagram 10 Take your assembled Base Board and align the beehive walls with the Base Board Risers Step 10 Nailing Beehive Box Use your 12 x 50mm nails to attach the assembled Base Board to the Beehive Box as shown in Diagram 11 Diagram 9 Diagram 10 Diagram 11 ...

Страница 6: ...e Step 12 Final Step Place 10 assembled beehive frames in the completed beehive then place the second completed Beehive Box on top insert 10 remaining frames Complete assembly by placing the pre assembled lid on top END OF BEEHIVE CONSTRUCTION 10x 20x 10x Frame Top Bar Frame Side Bar Frame Bottom Bar Diagram 12 Whitehouse BEEKEEPING Whitehouse BEEKEEPING ...

Отзывы: