PLUMBING
1. Run 1/2” water hose from pump to output valve on water tank. Note that the
hose is already connected to pump.
2. Run 1/2” bypass hose from unloader valve (already connected) to return
plumbing of water tank (slightly above output valve). Note that caution must
be used to not allow this hose to be kinked or pinched as it carries system pres-
sure when machine is running.
3. Drill a 1 1/8” hole through floor at the rear of the water tank for overflow hose.
Note that hose must be slit to insure pressure cannot build up in tank in case
hose gets blocked with ice , ect.
4. Connect 1/4” black vacuum hose from primer and pressure relief valves of ma-
chine to barb on recovery tank.
5. Connect 4” hose from blower input elbow to recovery tank filter assembly.
6. Run approximately 7’ of 3” hose from recovery tank to filter box if so
equipped. If no filter box, a 3” to 2” adapter is supplied to connect directly to
vacuum source.
7. Plumb 2” drain from recovery tank and clamp to floor. (Refer to Pro-1900
section pg. 6 G2)
8. Seal all holes through floor with silicone caulking.
***Drain location can vary according to vehicle type and size. Drawing is for
reference only.
9
Содержание PRO 1900
Страница 2: ......
Страница 6: ......
Страница 11: ...Muffler Installation Hanger may need modification 8 ...
Страница 15: ...12 ...
Страница 20: ......
Страница 24: ...20 ...
Страница 34: ......
Страница 56: ......
Страница 58: ......
Страница 61: ...White Magic Carpet Cleaners Accessories Catalog FP1900A LOWER FACE PANEL ASSEMBLY 6 A2 ...
Страница 67: ...White Magic Carpet Cleaners Accessories Catalog BA1900 BLOWER ASSEMBLY 6 A8 ...
Страница 69: ...White Magic Carpet Cleaners Accessories Catalog EA1900 FORD ENGINE ASSEMBLY 6 A10 ...
Страница 73: ...White Magic Carpet Cleaners Accessories Catalog FA1900 PRO 1900 MAIN FRAME ASSEMBLY 6 A14 ...
Страница 77: ...White Magic Carpet Cleaners Accessories Catalog 6 A18 ...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......