OPERATION
16
January 2011 / W-SC3 Mobile / EN
3 OPERATION
3.1 GENERAL
The generating set is operational after full installation and
filling up with: fuel, engine lubricating oil and cooling liquid,
filling the starter battery with acid, connecting the battery
to earth and connecting the digital remote control panel.
1 Filling
cap
2
Minimum oil level
3
Maximum oil level
Figure 9
:
3.2 OPERATING
INSTRUCTIONS
3.2.1
Summarised operating instructions (daily
use)
Routine "pre-start" checks:
1
Check oil level (refer to fig. 9).
2
Check coolant level.
3 Power source selector switch (off / shore power /
generator power). Switch to power source switch
"OFF", or switch off all consumers in the usual way. If
a MASTERSWITCH is installed, this operates
automatically.
4
Switch on battery switch (when installed).
5
Fuel valve: open.
Starting:
Push the start button to initiate the full automatic
starting procedure. You can monitor the procedure on
the display.
In operation checks:
1
Check for abnormal noise or vibration
2
Check the voltage
3 Power source selector switch (off/shore
power/generator power). Switch to power source
generator. If a MASTERSWITCH is installed, this
operates automatically.
4 Before loading the generating set up to maximum,
have it run warm. Continuous load should be
restricted to 70 % of maximum load.
Stopping generator:
1 Switch off all electrical devices (consumers). If the
generating set has been running under full load for a
longer period, do not shut it down abruptly. Reduce
the electrical load to about 30% of the rated load (i.e.
30% of 3 kW is approx. 1000W) and let it run for
approx. 5 minutes.
2
Press the STOP button.
3
Switch to another 230V power source, if available. If a
Masterswitch is installed, this is done automatically.
3.2.2
Extended operating instructions
Check when starting the first time or after a longer period
of rest:
1 If there is any damage caused by transport or
installation.
2 Check if installation conforms to the installation
instructions.
3 Ensure the generating set is free to turn without
obstruction.
4
Check all hoses and hose connections for leaks.
5
Check all cables and cable end terminal connections.
6
Check the engine and generator mounting bolts.
Routine "pre-start" checks:
1
Check engine oil level.
The generator switches off in the event of insufficient
oil-pressure. Even when the oil level is too low the oil
pressure can be high enough. Do not run the
generator with the oil below the lowest mark in the,
because a smaller volume of oil will become
contaminated considerably quicker than a larger
volume. Therefore we recommend daily oil-checks.
Check oil level prior to starting the engine or at least 5
minutes after the engine has stopped.
2
Check coolant level
3
Check for leaks.
4 If no MASTERSWITCH is used: Switch main Power
Source Selector switch to "OFF" or switch off all
devices.
5
Switch on the battery switch.