
PAGE 7
FOR SERVICE TECHNICIAN’S USE ONLY
DO NOT REMOVE OR DES
TROY
Step #
Action
Component
User Interface Response
1
User enters Service Test Mode
Display shows “888” for
through Service Diagnostics.
2 seconds. All LEDs (except
for POWER) are off, and
the START button is flashing.
2
Press and release START
Motor On
The display will show “---” until
to begin the L2 Voltage Check.
the voltage is available at the UI.
If START is pressed again or
pressed and held before L2 voltage is
available, a tone will sound 3 times.
3
L2 Voltage Check completes.
Motor On
If electric (Fuel = Electric):
Vrms_L2 and Fuel are published
Heater(s) On
The UI will report findings per the
to the UI.
“Electric Dryer Results Display”
section where L2 Voltage is available,
L1 Voltage Check
L1 Voltage is not available,
starts automatically.
Heater Voltage is not available,
and Airflow is not available.
If gas (Fuel = Gas):
The display will continue
to show “---”.
If START is pressed again or
pressed and held before L1 voltage is
available, a tone will sound 3 times.
4
L1 voltage check completes.
Motor On
If electric (Fuel = Electric):
Vrms_L1 and Heater_Voltage
Heater(s) On/Off
The UI will report findings per the
are published to the UI.
“Electric Dryer Results Display”
section where L2 Voltage is
Check for Warm Machine begins
available, L1 Voltage is available,
automatically. Airflow begins
Heater Voltage is available,
detection algorithm: Status_Airflow =
and Airflow is not available.
3 (Detecting).
If gas (Fuel = Gas):
The UI will report findings per the
“Gas Dryer Results Display” section
where Heater Voltage is available
and Airflow is not available.
Press and hold START
If a “Detecting Airflow” indicator
to jump to Step 8 and start the
is present, it is displayed on
Steam Test (steam models only).
the UI.
5
Check for Warm Machine completes.
Motor On
UI continues to display
Heater(s) On
as in Step 4.
Load Mass for Airflow
begins automatically.
Press and hold START
to jump to Step 8 and start the
Steam Test (steam models only).
SERVICE TEST MODE CHART
NOTE:
After step 3, press and hold the START button for 5 seconds to jump to the water system test.
Electric dryer performance is optimized for 2-phase, 240 VAC service. If complaint is made regarding electric dryer performance and the
L1 to L2 voltage is ~208 VAC, dryer may be connected to a 3-phase service with reduced wattage that will decrease dryer performance.
Содержание Bravos XL
Страница 28: ...PAGE 28 FOR SERVICE TECHNICIAN S USE ONLY DO NOT REMOVE OR DESTROY Notes ...
Страница 58: ...POUR LE TECHNICIEN SEULEMENT PAGE 58 NE PAS ENLEVER NI DÉTRUIRE NOTES ...
Страница 59: ...PAGE 59 POUR LE TECHNICIEN SEULEMENT NE PAS ENLEVER NI DÉTRUIRE NOTES ...
Страница 60: ...POUR LE TECHNICIEN SEULEMENT PAGE 60 NE PAS ENLEVER NI DÉTRUIRE 04 15 NOTES ...