Installation Manual: Whipple SC 21_F150_R5
Last Updated: June 12
th
, 2021
Page 16 of 39
www.whipplesuperchargers.com
37.
Apply generous amount of grease to the injector orings for ease of installation. Install the fuel injectors, rails and
lock bracket to the intake manifold, secure with the (4) 6mm x 16mm SHCS using a 5mm allen socket and use
Blue
Loctite #243
. Torque to 90 lbs-in.
38.
Install the supplied ¼” ID bypass actuator to the bypass nipple and ¼” 90deg nipple on SC inlet. CAUTION: Do
not open/close bypass actuator by hand. This may damage actuator internally. It only moves properly with equal
vacuum/boost at the actuator reference port.
39.
Install the (3) supplied 6AN viton orings (#906) to the (1) 6 ORB to 9.89mm, the (1) 6 ORB to 15.82mm and (1) 6
ORB plug supplied from bag WBG-FORD-009. Bank 1 side, install (1) 15.82mm fitting to port using a 7/8” deep
socket. Bank 2 side, install the 9.89mm fitting in the top port using a 11/16” deep socket or wrench. Bank 2 side,
install (1) 6 ORB plug to the lower port using a 6mm allen socket.