Wheelock SP4-RMX Скачать руководство пользователя страница 3

 

 

     P84557 

 

 

          Sheet 3 of 14 

 
 

CAUTION:  

The SP4-RMX printed circuit board is sensitive to static electricity and has delicate components mounted on it.  

Before handling either a board or any component on a board, discharge any static electricity from your body by touching a grounded 
object such as a metal screw which is connected to earth ground.  Handle the board by its edges, and be careful not to twist or flex it.   

CAUTION:  

When the SPRM-GP is used on a SP4-RMX and SPB-80/160/320 location, the paging from that microphone will 

only be heard from zones that have BGM turned on in the software. 
 
Install the SP4-RMX in a static free area and the user is to properly attach grounded wrist straps before touching any static sensitive 
areas.  After handling printed circuit boards, the SP4-RMX should be tested in accordance with the “System Checkout” section to 
verify that the printed circuit boards are undamaged and functioning properly.

 

 

CAUTION:  

The Authority Having Jurisdiction (AHJ) should be consulted by the installer prior to installation. 

 

Installation Guidelines: 

 
 
  1.  Prepare a drawing of the complete system wiring.  (Keep copies of the system wiring drawing and this SP4-RMX Installation 

Instructions with the SAFEPATH4 panel for reference.)  These Installation Instructions shall be made available to all qualified 
personnel who operate, test, maintain, or service SAFEPATH4 products. 

 
  2.  Carefully unpack the SP4-RMX and make sure each item described on the packing slip is present and undamaged. 
 
  3.  Mount the SP4-RMX in the desired location as described in the "Mounting" section. 
 
  4.  Mount any additional wiring boxes or junction boxes needed to interconnect field wiring. 
 
  5.  Connect conduit fittings or bushings as needed using knockouts provided on the top and bottom of the SP4-RMX units (see 

Figure 2). 

 
  6.  Install field wiring in conduit when necessary, following the National Electrical Code and local codes for the type of system 

being installed.  Make all necessary connections at any additional wiring or junction boxes. 

 
 

CAUTION:  

Provide proper strain relief for all wiring not in conduit. 

 
 
  7.  Connect the SP4-RMX to earth ground, following the National Electrical Code and local codes for the type of system being 

installed. 

 
  8.  Check the integrity of all field wiring following the directions in the "Field Wiring Checkout'' section.  Confirm that the 

specified cable is installed and that there is continuity between required points (no open circuits), with no unwanted connections 
(shorts) to other conductors, chassis, or earth ground. 

 
  9.  Connect the wiring to the appropriate terminals of the SP4-RMX modules following the directions in the "Field Wiring" section 

and the system wiring drawing you created in Step 1. 

 
10.  Set the switches for the proper configuration as described in the “Application” sections. 

Содержание SP4-RMX

Страница 1: ...e number of optional Remote Microphones SPRM or SPRM GP to three The PCB assembly is mounted in an enclosure READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT NOTE All CAUTIONS and WARNINGS...

Страница 2: ...out basis Technical Specifications Electrical Input Voltage 24 VDC Input Current 52mA max RM Page 62mA max Standby Auxiliary Audio Input 1Vrms Relay Ratings K1 and K3 2A 30Vdc 1pF K2 K4 K5 and K6 1A...

Страница 3: ...o all qualified personnel who operate test maintain or service SAFEPATH4 products 2 Carefully unpack the SP4 RMX and make sure each item described on the packing slip is present and undamaged 3 Mount...

Страница 4: ...MX Cable Size 14 22 AWG Shielded One end of the shield must be connected at the SafePath4 panel or SP4 RMX enclosure Maximum Length 20 Feet Restrictions All wiring between SP40 2 or Audio Booster and...

Страница 5: ...P84557 D Sheet 5 of 14 6 00 CONDUITKNOCKOUTS 2 PLACES BOTHENDS 11 00 MOUNTINGHOLES MOUNTINGHOLES GROUND TERMINALS Figure 2 SP4 RMX Mounting NOTE Drawing is not to scale...

Страница 6: ...J1 ALL CONNECTIONS BETWEEN SP40 AND RMX ARE SUPERVISED THESE CONNECTIONS MUST BE RUN IN NO MORE THAN 20 FT OF CONDUIT AND WITHIN THE SAME ROOM ALL CONNECTIONS BETWEEN RMX AND REMOTE MICS ARE SUPERVIS...

Страница 7: ...RMX Modules 10K EOLR AUX IN CC NAC SP40 2 24 VDC 10K EOLR 10K EOLR 10K EOLR 10K EOLR S3 S2 S3 SW2 RM3 VOL RM2 VOL RM1 VOL 1V 25V 70V AUX VOL R37 J1 S3 S2 S1 SW2 RM3 VOL RM2 VOL RM1 VOL 1V 25V 70V AUX...

Страница 8: ...HESE CONNECTIONS MUST BE RUN IN NO MORE THAN 20FT OF CONDUIT AND WITHIN THE SAME ROOM REFER TO FIGURE 3 FOR SPRM G P CONNEC TIONS ALL CONNEC TIONS ARE SUPERV ISED SP40 2 SP4 RMX SPB 10K OHM EOLR 10K O...

Страница 9: ...SPRM connected Insure the corresponding switch is OFF for any SPRM inputs not used Set switch S1 on SW2 to the desired position according to Table 1 Set S2 to ON Switch S3 to the ON position Set switc...

Страница 10: ...of the SP40 2 and SPB audio boosters In SP40 mode each SP4 RMX provides the capability of connecting and supervising up to three SPRM emergency remote microphone modules In SPB mode the SPRM GP Gener...

Страница 11: ...o booster modules the SP40 2 AUDIO OUT is connected to the SP4 RMX AUX IN and the SP4 RMX AUDIO OUT is connected to the SPB AUDIO IN This means that the priority level of the SPRM GP modules are after...

Страница 12: ...Use the following troubleshooting table to locate the trouble area Table 4 Trouble LED Indicators D30 SYS PWR D29 SYS TRB LED Indicator Remarks ON OFF Normal OFF OFF 24VDC not applied Check PWR IN ter...

Страница 13: ...13 of 14 S3 S2 S1 SW2 RM3 VOL RM2 VOL RM1 VOL 1V 25V 70V AUX VOL R37 J1 AUX TRB ALM TRB RM1 TRB WIRE SHT WIRE OPEN SYS TRB SYS PWR D24 D25 D26 D27 D28 D23 D22 D29 D30 RM2 TRB RM3 TRB Figure 6 SP4 RMX...

Страница 14: ...SPECIFICATION ABUSE ACCIDENT OR OTHER OPERATING CONDITIONS BEYOND WHEELOCK S CONTROL SOME WHEELOCK PRODUCTS CONTAIN SOFTWARE WITH RESPECT TO THOSE PRODUCTS WHEELOCK DOES NOT WARRANTY THAT THE OPERATI...

Отзывы: