WD-215T
Rev. 6.0 (201812)
Installation instructions
14
3.5.4
Steam (option, steam-heated machines)
Connect the pipe for steam inside the front cover plate (6). The connection is fitted
with a filter. A shut-off valve for steam must be installed on the incoming pipe. The
required steam pressure can be found in the TECHNICAL SPECIFICATIONS.
3.5.5
Condensation water (option, steam-heated machines)
Connect the pipe for condensation water inside the front cover plate (7). The pipe
is connected to the system’s steam boiler.
3.5.6
Drain/waste pipe
The waste water system connected to (5) should consist of a 50 mm metal pipe
that will withstand mechanical impacts. Remove the perforated section of the end
plate at (A) and pull the pipe through the hole. The drain must run to a floor drain,
where its opening must be above the water level. Ensure that the drain connection
is kept in place by using e.g. cable ties in the designated areas.
The requirement for the floor drain capacity can be found in the TECHNICAL
SPECIFICATIONS.
3.5.7
Detergent and drying agent
Check what your machine is equipped with, which depends on the model, machi-
ne type and country.
•
Use the same make and type of detergent and drying agent.
•
With machines connected to cold water, the water pipe temperature may
be too low for use of powder or paste type detergents.
•
If liquid detergent is used together with Wexiödisk’s detergent pump, the
detergent must be placed under the machine’s tank level.
•
If equipment for a different type of detergent is used, it should preferably be
put on the wall behind the machine to avoid holes being drilled unnecessa-
rily in the machine
The process of setting the detergent and drying agent dispenser is described in
the ADJUSTMENT INSTRUCTIONS.
For information about electrical connections, see the electrical diagram.