
WD-215T
Rev. 6.0 (201812)
Installation instructions
11
3.4
Installation
3.4.1
Preparing for the installation
Check that there is sufficient room for the machine at the installation location.
•
Check that correct connections are available for water, electricity, drainage
and possibly steam at the installation location. See TECHNICAL SPECIFI-
CATIONS.
•
Check that the overheating protection device is reset.
3.4.2
Positioning the machine
Check the following points before the machine is placed in position:
•
Check that the fuse for the machine at the site is off, blocked and that out-
going electrical circuits from the machine are non-live.
•
Remove the protective plastic on the sides which are to be stood against a
wall.
•
The distance between the wall and machine should be at least 15-30mm.
Place the machine in position and check that it, and any accessories, are horizon-
tally level. Adjust the height with the legs.
Check with a spirit level that the machine is standing level:
•
On the cover edge of the front side (a) (tank body).
•
On the cover of the infeed (b).
•
On the cover of the outfeed (c).
. Once the machine has been filled with water, do another check to make sure the
machine is standing level.
215T_plac
b
a
c
a
a
Содержание WD-215T
Страница 51: ......